BLD-Final | 10/7/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/7/2004 at 2:28:48 PM. Contact: ###-####. lc issued 10/8/2004 11:41:55 AM
|
BLD-Conference | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PART |
Troy James
|
|
|
Reviewed exterior stair requirements with builder.
|
BLD-Framing/Rough-in | 8/12/2004 | 8/13/2004 | 8/13/2004 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/12/2004 at 2:49:05 PM. Contact: ###-####.
wanted shear,,, not reqd. so its ok to side and roof,,, no inspection made 8/13/2004 11:41:25 AM
|
BLD-Foundation | 7/13/2004 | 7/14/2004 | 7/14/2004 | A | PASS |
Dave Hannah
|
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 7/7/2004 | 7/8/2004 | 7/8/2004 | A | PART |
Dave Hannah
|
|
|
Brandon; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 7/8/2004 9:38:43 AM
|