Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-00991
StatusFinaled
Name EKC INC
Site Address 1909 N 12TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
"The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City."To construct a new 484s.f. garage with 484s.f. of non conditioned, un finished and uninsulated of upper level that is unfinished with roughted in plumbing for a future bathroom on the upper level. There is to be no wall cover or insulation installed for the upper level. Separate permits are required to finish this upper level. The only electrical allowed is 1-light, 1-switch, and 1-ground fault receptical. All per the approved plans as marked, attached DRH04-00092 and plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/7/200410/8/200410/8/2004PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/7/2004 at 2:28:48 PM. Contact: ###-####. lc issued 10/8/2004 11:41:55 AM
BLD-Conference9/24/20049/24/20049/24/2004PPART
DetailsTroy James
Reviewed exterior stair requirements with builder.
BLD-Framing/Rough-in8/12/20048/13/20048/13/2004APART
DetailsTony Young
Scheduled by a contractor via Hello! on 8/12/2004 at 2:49:05 PM. Contact: ###-####.
wanted shear,,, not reqd. so its ok to side and roof,,, no inspection made 8/13/2004 11:41:25 AM
BLD-Foundation7/13/20047/14/20047/14/2004APASS
DetailsDave Hannah
brandon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing7/7/20047/8/20047/8/2004APART
DetailsDave Hannah
Brandon; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 7/8/2004 9:38:43 AM