Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-01033
StatusFinaled
Name ELDER-JONES
Site Address 350 N MILWAUKEE ST Unit: 2109
Project NameBTS - #2109
Customer Number 
ePlanReviewNo
Description
(BUILD-A-BEAR WORKSHOP)(BOISE TOWNE SQUARE-SPACE 2109) To remodel an existing 2,716 sq.ft. retail tenant space for new tenant per approved plans. Work to include construction of one new accessible restroom, installation of a new suspended ceiling system, construction of new partitions, installation of new lighting and hvac system, construction of a new storefront with roll-up security grill. This building is fully fire sprinklerd and contains a smoke evacuation system any alterations to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department, the smoke evacuation system shall remain operational as origanally installed. (pc#308-04)rmh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/16/20049/17/20049/17/2004PPASS
DetailsLane Manuel
tarin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection9/16/20049/17/20049/17/2004APASS
DetailsTroy Cobbley
Fire life safety finaled 9/17/2004 8:57:13 AM
Permanent Occupancy 9/17/20049/17/2004 DONE
Details
FIRE-Final Inspection9/15/20049/16/20049/16/2004AFAIL
DetailsTroy Cobbley
relocate the front duct smoke detector and tag the fire extinguishers 9/16/2004 1:13:49 PM
BLD-Framing/Rough-in9/10/20049/13/20049/13/2004APART
DetailsLane Manuel
TERRAN; Phone #: ###-#### Internet Inspection Request from: Annette Moore
susp.ceiling @ stock room ok 9/13/2004 11:10:59 AM
BLD-Framing/Rough-in9/3/20049/3/20049/3/2004PPART
DetailsLane Manuel
terran; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in9/2/20049/2/20049/2/2004PNR
DetailsLane Manuel
tarren - Note: ceiling inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
need mechanical insp. before placing tiles 9/2/2004 4:01:28 PM
BLD-Framing/Rough-in8/9/20048/10/20048/10/2004APART
DetailsLane Manuel
Tehron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
framing @ storefront soffit ok. Still need to chk attachment @ air handler when installed. 8/10/2004 10:58:44 AM
BLD-Framing/Rough-in8/5/20048/6/20048/6/2004APART
DetailsJim Sly
theron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Walls OK Except storefront soffit framing. Need to check penitrations above ceiling line and New air handler attachment to open web joists at ceiling inspection. 8/6/2004 12:58:07 PM