BLD-Final | 9/16/2004 | 9/17/2004 | 9/17/2004 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/16/2004 at 4:07:36 PM. Contact: ###-####.
c of o ok 9/17/2004 10:09:50 AM
|
BLD-Final | 9/15/2004 | 9/16/2004 | 9/16/2004 | A | NR |
Jim Sly
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/N Need HVAC final....then call for Struct.... 9/16/2004 10:53:34 AM
|
FIRE-Final Inspection | 9/15/2004 | 9/16/2004 | 9/16/2004 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 9/16/2004 9:01:37 AM
|
Permanent Occupancy | | 9/16/2004 | 9/16/2004 | | DONE |
|
|
|
|
BLD-Final | 9/14/2004 | 9/15/2004 | 9/15/2004 | A | NR |
Lane Manuel
|
|
|
###-#### steve
|
BLD-Final | 9/15/2004 | 9/15/2004 | 9/15/2004 | P | FAIL |
Lane Manuel
|
|
|
###-#### steve
left c/n for misc items 9/15/2004 3:52:28 PM
|
FIRE-Final Inspection | 9/15/2004 | 9/15/2004 | 9/15/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide sticker at the main exit/entry 9/15/2004 3:46:18 PM
|
FIRE-Alarm Testing | 9/13/2004 | 9/14/2004 | 9/14/2004 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 9/13/2004 at 9:28:34 PM.///scheduled wrong
|
FIRE-Final Inspection | 9/13/2004 | 9/14/2004 | 9/14/2004 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 9/13/2004 at 9:27:34 PM.///scheduled wrong
|
FIRE-Final Inspection | 9/14/2004 | 9/14/2004 | 9/14/2004 | P | CANC |
Troy Cobbley
|
|
|
sprinkler plan resubmittals have not been approved yet 9/14/2004 2:36:23 PM
|
FIRE-Sprinkler Rough-in | 9/13/2004 | 9/14/2004 | 9/14/2004 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 9/13/2004 at 9:29:16 PM.///scheduled wrong
|
BLD-Framing/Rough-in | 8/16/2004 | 8/17/2004 | 8/17/2004 | A | PART |
Lane Manuel
|
|
|
steve4; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
left c/n reg. door clearance 8/18/2004 4:07:17 PM
|