BLD-Final | 1/25/2005 | 1/25/2005 | 1/25/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/25/2005 at 9:24:49 AM. Contact: ###-####. ok for perm occ 1/25/2005 2:08:15 PM
|
Permanent Occupancy | | 1/25/2005 | 1/25/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 1/25/2005 | 1/25/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/20/2005 | 1/20/2005 | 1/20/2005 | A | PASS |
Rick Jackson
|
|
|
|
BLD-Final | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | CANC |
Dave Hannah
|
|
|
|
BLD-Final | 1/10/2005 | 1/10/2005 | 1/10/2005 | A | CANC |
Dave Hannah
|
|
|
ok for temp occ ok for perm after alarm is finaled
|
BLD-Conference | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 3:12:25 PM. Contact: ###-####.
|
FIRE-Conference | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 3:11:00 PM. Contact: ###-####. Temp occupancy approved per Dave M. pending resubmittals for fire alarm address changes 1/7/2005 10:45:36 AM
|
BLD-Framing/Rough-in | 9/9/2004 | 9/9/2004 | 9/9/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/9/2004 at 9:33:46 AM. Contact: ###-####. ok to cover wall that have no elec in them and ok to cover the rest after elec r/i 9/9/2004 3:38:29 PM
|
BLD-Framing/Rough-in | 9/7/2004 | 9/8/2004 | 9/8/2004 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/7/2004 at 3:31:16 PM. Contact: ###-####.add wall bracing remove screws from top track to ceiling grid 9/8/2004 2:40:38 PM
|