BLD-Final | 10/20/2004 | 10/21/2004 | 10/21/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/20/2004 at 3:11:50 PM. Contact: ###-####. OK for Perm Occ. :) 10/21/2004 10:34:26 AM
|
Permanent Occupancy | | 10/21/2004 | 10/21/2004 | | DONE |
|
|
|
|
Code Occupancy Approval | 10/20/2004 | 10/20/2004 | 10/20/2004 | P | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF 10/20/2004 3:45:34 PM
|
BLD-Final | 10/15/2004 | 10/18/2004 | 10/18/2004 | P | NR |
Jim Sly
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need Zoning (if applicable) and Code Enforce. 10/18/2004 3:38:15 PM
|
FIRE-Final Inspection | 10/15/2004 | 10/18/2004 | 10/18/2004 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 10/18/2004 11:53:56 AM
|
BLD-Final | 10/6/2004 | 10/7/2004 | 10/7/2004 | P | NR |
Jim Sly
|
|
|
jeff -- pending fire insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 10/7/2004 12:55:30 PM
|
FIRE-Final Inspection | 10/6/2004 | 10/7/2004 | 10/7/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide correct remote annunciator for the duct smoke detector. Provide red curbing as discussed for the fire lane. Provide approved hardware on south doors as discussed. 10/7/2004 1:53:39 PM
|
BLD-Framing/Rough-in | 9/28/2004 | 9/28/2004 | 9/28/2004 | P | PART |
Jim Sly
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Canopy OK. 9/28/2004 4:02:40 PM
|
BLD-Energy code compliance | 9/13/2004 | 9/14/2004 | 9/14/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/13/2004 at 7:16:07 PM. Contact: ###-####. Paper removed from exposed portion of insulation. 9/14/2004 12:25:15 PM
|
BLD-Wall cover | 9/3/2004 | 9/7/2004 | 9/7/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 5:17:26 PM. Contact: ###-####. 9/7/2004 2:56:23 PM Told Contractor to remove Kraft facing from Existing ceiling insulation exposed during construction. 9/7/2004 2:59:55 PM
|
BLD-Framing/Rough-in | 8/25/2004 | 8/26/2004 | 8/26/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/25/2004 at 1:54:36 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/19/2004 | 8/20/2004 | 8/20/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/19/2004 at 12:52:12 PM. Contact: ###-####. All straps at roof/wall connect OK except for straps to tie new to old at existing open web trusses....Need repairs at existing trusses prior to strapping. 8/20/2004 12:13:59 PM
|
BLD-Foundation | 7/28/2004 | 7/29/2004 | 7/29/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/28/2004 at 2:42:25 PM. Contact: ###-####.
|
BLD-Footing | 7/27/2004 | 7/28/2004 | 7/28/2004 | A | PASS |
Dave Hannah
|
|
|
Ken; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Footing | 7/26/2004 | 7/27/2004 | 7/27/2004 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/26/2004 at 1:49:23 PM. Contact: ###-####.
|