BLD-Final | 9/15/2004 | 9/15/2004 | 9/15/2004 | P | PASS |
Jim Sly
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK for Perm Occ. :) 9/15/2004 2:18:55 PM
|
FIRE-Final Inspection | 9/15/2004 | 9/15/2004 | 9/15/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled. Per contractor the hvac unit is under 2000cfm 9/15/2004 1:04:40 PM
|
Permanent Occupancy | | 9/15/2004 | 9/15/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/14/2004 | 9/14/2004 | 9/14/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguisher and correct hardware on the double doors to the conference room 9/14/2004 10:34:53 AM
|
BLD-Final | 9/13/2004 | 9/13/2004 | 9/13/2004 | P | FAIL |
Jim Sly
|
|
|
davd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/N Need fire final....Note: Break rm. counter too high. 9/13/2004 2:50:47 PM
|
BLD-Framing/Rough-in | 8/26/2004 | 8/27/2004 | 8/27/2004 | A | PASS |
Jim Sly
|
|
|
dave-note: ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles dave -Grid OK note: ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 8/27/2004 10:24:13 AM
|
BLD-Framing/Rough-in | 8/16/2004 | 8/17/2004 | 8/17/2004 | A | PASS |
Jim Sly
|
|
|
melody;note: if possible 11:00 am - Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Energy code compliance | 8/5/2004 | 8/6/2004 | 8/6/2004 | A | NR |
Jim Sly
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 8/6/2004 | 8/6/2004 | 8/6/2004 | P | PART |
Jim Sly
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Couple of int walls left......Check wall and bracing at ceiling insp. 8/6/2004 2:11:00 PM
|