BLD-Aging Inspection | 6/22/2006 | 6/22/2006 | 6/22/2006 | | DONE |
Mike Jordan
|
|
|
job has been finaled.
|
DOC - Permit Finaled | 6/22/2006 | 6/22/2006 | 6/22/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 4/17/2006 | 4/17/2006 | 4/17/2006 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 4/17/2006 | 4/17/2006 | 4/17/2006 | P | DONE |
Mike Jordan
|
|
|
|
Permanent Occupancy | | 1/5/2005 | 1/5/2005 | | DONE |
|
|
|
|
BLD-Final | 12/6/2004 | 12/6/2004 | 12/6/2004 | P | PASS |
Lane Manuel
|
|
|
jack ###-####
perm c of o ok 12/6/2004 1:26:47 PM
|
FIRE-Conference | 12/6/2004 | 12/6/2004 | 12/6/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 12/6/2004 2:02:42 PM
|
FIRE-Conference | 12/6/2004 | 12/6/2004 | 12/6/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 12/6/2004 2:02:42 PM
|
Code Occupancy Approval | 12/3/2004 | 12/3/2004 | 12/3/2004 | A | PASS |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED FINAL SIGNED OFF. 12/3/2004 11:46:54 AM
|
FIRE-Final Inspection | 12/3/2004 | 12/3/2004 | 12/3/2004 | P | FAIL |
Troy Cobbley
|
|
|
Need air balance report for hood 12/3/2004 2:37:15 PM
|
BLD-Framing/Rough-in | 11/26/2004 | 11/26/2004 | 11/26/2004 | P | PART |
Lane Manuel
|
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Jan Rice
Perimeter insulation w/ either foil back, or 6 mil plastic cover (above ceil. grid )
t-bar @ dining area/ kitchen ok, to leave areas exposed to verify support of decorative discs. 11/26/2004 12:04:55 PM
|
BLD-Framing/Rough-in | 10/29/2004 | 11/1/2004 | 11/1/2004 | A | PASS |
Jim Sly
|
|
|
Jack; Phone #: ###-#### Internet Inspection Request from: Jan Rice Strapping, Hold downs and Energy OK 11/1/2004 10:39:04 AM
|
BLD-Framing/Rough-in | 10/28/2004 | 10/28/2004 | 10/28/2004 | P | PART |
Troy James
|
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
ok to cover interior walls upon electrical approval. Need to check for holddowns and strapping at beams at insulation inpsection. 10/28/2004 2:44:20 PM
|
BLD-Framing/Rough-in | 10/21/2004 | 10/22/2004 | 10/22/2004 | A | PART |
Jim Sly
|
|
|
Jack-NOTE: Late morning; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner Parapet wall framing, blocking, straps and shear nailing (4&12 6d) OK from midway... W. wall around the south side to the pop out on E. wall. 10/22/2004 10:59:20 AM 10/22/2004 11:00:04 AM
|
BLD-Framing/Rough-in | 10/19/2004 | 10/19/2004 | 10/19/2004 | P | PART |
Jim Storey
|
|
|
jack; Phone #: ###-#### Note: Inspection early afternoon if possible Internet Inspection Request from: Cathy Chiles north east and west exterior ok for cover. 10/19/2004 4:54:34 PM
|
BLD-Framing/Rough-in | 10/15/2004 | 10/18/2004 | 10/18/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/15/2004 at 4:36:36 PM. Looked at new exterior parapet walls, wip, need midline blocking per plans. 10/18/2004 3:09:15 PM
|
BLD-Footing | 10/13/2004 | 10/14/2004 | 10/14/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/13/2004 at 2:05:49 PM. Contact: ###-####. Footing (pads) at S. wall and E. OK pending Special Insp (Strata) tests and approvals. 10/14/2004 11:17:10 AM
|