BLD-Final | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Tom Arcoraci
|
|
|
ok for occ cert 10/8/2004 1:08:39 PM
|
BLD-Framing/Rough-in | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Tom Arcoraci
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 10/8/2004 12:23:07 PM
|
BLD-Framing/Rough-in | 8/17/2004 | 8/18/2004 | 8/18/2004 | P | PASS |
Tom Arcoraci
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 8/9/2004 | 8/9/2004 | 8/9/2004 | P | DONE |
Troy Cobbley
|
|
|
I spoke to the contractor about door hardware requirements. Lever type is ok. Exit signs and emergency lights are not required but he was going to install them anyway. 8/9/2004 3:39:52 PM
|