Permanent Occupancy | | 12/6/2004 | 12/6/2004 | | DONE |
|
|
|
|
BLD-Final | 11/2/2004 | 11/3/2004 | 11/3/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/2/2004 at 3:17:28 PM. Contact: ###-####. OK for Perm Occ. :) 11/3/2004 3:07:42 PM
|
FIRE-Final Inspection | 11/1/2004 | 11/2/2004 | 11/2/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 11/2/2004 3:21:14 PM
|
FIRE-Final Inspection | 10/29/2004 | 11/1/2004 | 11/1/2004 | A | FAIL |
Troy Cobbley
|
|
|
Remove keyed hardware on the interior exit doors and provide sticker on the exterior exit doors. 11/1/2004 12:03:13 PM
|
BLD-Energy code compliance | 10/4/2004 | 10/5/2004 | 10/5/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/4/2004 at 2:23:20 PM. Contact: ###-####. Frame Pass. 10/5/2004 9:32:28 AM
|
BLD-Conference | 9/7/2004 | 9/8/2004 | 9/8/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/7/2004 at 3:04:44 PM. Contact: ###-####. Door to dog food starage..... Install concealed header for 6-8 door. 9/8/2004 10:56:13 AM
|
BLD-Footing | 8/31/2004 | 9/1/2004 | 9/1/2004 | P | PASS |
Jim Sly
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Footing and stem wall OK.... Contr to install 3" insulation prior to slab. He has on site. 9/1/2004 12:36:50 PM
|