Permit NumberBLD04-01247
StatusFinaled
Name PACWEST HOMES LLC
Site Address 8493- 8495 W EVENING STAR DR
Project NameDUPLEX
Customer Number 
ePlanReviewNo
Description
To construct a 3162 sq. ft. two story DUPLEX. Each unit has three bedrooms, two and half bathrooms with 1581 sq. ft. (765 sq. ft. first floor/816 sq. ft. second floor) with a attached 496 sq. ft. two car garage and a 96 sq. ft. covered back porch. Per approved plans and requirement list. THE CONSTRUCTION OF THE DWELLING UNIT SEPARATION WALLS ARE DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. NOTE: conversion permits and either a recorded subdivision or a zoning certificate and recorded of survey must be completed prior to selling as individual units. PC#284 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/28/20051/31/20051/31/2005APASS
DetailsLane Manuel
Ryan; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Energy code compliance11/12/200411/12/200411/12/2004PPASS
DetailsLane Manuel
###-#### david
framing ok for both units.
R-19 in walls
Check blown in attic, and @ crawl. 11/12/2004 1:35:04 PM
BLD-Framing/Rough-in11/9/200411/9/200411/9/2004PPASS
DetailsLane Manuel
###-#### - david
ok to insulate.
designer to address connections @ girder trusses @ fire wall. no connection for wall below to corner, w/ 5,100 lb load above 11/9/2004 2:19:02 PM
BLD-Framing/Rough-in9/30/20049/30/20049/30/2004PPART
DetailsLane Manuel
###-#### - mike Note: fire wall
upstairs firewalls ok 9/30/2004 3:57:19 PM
BLD-Framing/Rough-in9/20/20049/20/20049/20/2004PPART
DetailsLane Manuel
Fire wall inspection please///###-#### mike
upstairs portion of interior firewalls ok, w/firestopping @ 10ft. oc 9/20/2004 1:59:32 PM
BLD-Foundation8/11/20048/12/20048/12/2004APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 8/11/2004 at 8:32:42 AM. Contact: ###-####.
BLD-Footing8/11/20048/11/20048/11/2004PCANC
DetailsLane Manuel
Scheduled by a contractor via Hello! on 8/11/2004 at 8:32:15 AM. Contact: ###-####.