Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-01575
StatusFinaled
Name MCLEOD JAMES MICHAEL &
Site Address 400 E CRESTLINE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is hillside ordinae area is for a 67s.f. addition to an existing 2590s.f. 2-story single family dwelling. "THE PERMIT HOLDER IS RESPONSIBLE TO COMPLY WITH CURRENT WALL BRACING REQUIREMENTS AS ADOPTED BY BOISE CITY" ESC hillside plan waiver approved by sgw 7/15/2004. This project is to include the removal of approx 18l.f. of existing concrete foundation wall and extending the main level of and moving the main entry to the new extension. The project will also include the extension of the existing rear upper level deck in the rear of the dwelling by 10'-0" with new code complying guardrails. Per Terry Records footing subgrade is to be inspected and approved prior to structural division ok to place concrete. Separate electrical and ESC permits are required. All per the approved plans as marked; hillside foundation engineering attached REScheck and plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/20/20049/20/20049/20/2004PPASS
DetailsTroy James
kim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing8/18/20048/18/20048/18/2004PPASS
DetailsDave Hannah
deck ft -john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing8/16/20048/17/20048/17/2004ADONE
DetailsDave Hannah
deck ft -john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance8/9/20048/9/20048/9/2004PPASS
DetailsTroy James
kim; Phone #: ###-#### - please call 30 min prior to inspection - Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in8/3/20048/3/20048/3/2004PPART
DetailsTroy James
kim; Phone #: ###-#### Internet Inspection Request from: Annette Moore Shear ok to cover. 8/3/2004 1:48:24 PM
BLD-Foundation7/19/20047/20/20047/20/2004APASS
DetailsTroy James
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
7/20/2004 10:27:36 AM
BLD-Grading Inspection7/20/20047/20/20047/20/2004 PASS
Footing subgrade for front has been approved by the geotechnical engineer.
BLD-Footing7/19/20047/19/20047/19/2004PPASS
DetailsTroy James
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles front entry footing ok 7/19/2004 1:15:17 PM