BLD-Footing | 11/29/2004 | 11/30/2004 | 11/30/2004 | A | NR |
Jim Sly
|
|
|
kelly; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 11/8/2004 | 11/9/2004 | 11/9/2004 | A | PASS |
Jim Sly
|
|
|
Craig; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 10/18/2004 | 10/19/2004 | 10/19/2004 | P | FAIL |
Troy James
|
|
|
lorie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Need mechanical connection to tie interior bearing wall to exterior wall, exterior wall to garage, remove threshold at door top of stairs. Attic access above garage. ok to insulate10/19/2004 4:08:26 PM 10/19/2004 4:08:41 PM
|
BLD-Framing/Rough-in | 9/7/2004 | 9/7/2004 | 9/7/2004 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/7/2004 at 9:04:05 AM. Contact: ###-####. C/N ...Need all permits and R/I approvals for all trades prior to frame. 9/7/2004 1:55:15 PM
|
BLD-Footing | 7/30/2004 | 8/2/2004 | 8/2/2004 | P | PASS |
Jim Sly
|
|
|
Craig or Lori; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Footing | 7/30/2004 | 8/2/2004 | 8/2/2004 | A | PART |
Jim Sly
|
|
|
frank stevens; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Setbacks OK....Not formed yet......Contr said he would make footings min 16". N Wildwood L Abrahm. 8/2/2004 8:26:31 AM 8/2/2004 8:27:12 AM
|
BLD-Foundation | 8/2/2004 | 8/2/2004 | 8/2/2004 | P | PASS |
Jim Sly
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|