Permanent Occupancy | | 5/3/2005 | 5/3/2005 | | DONE |
|
|
|
|
BLD-Final | 4/18/2005 | 4/18/2005 | 4/18/2005 | P | PART |
Dave Hannah
|
|
|
as late as possible// mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for temp occ ok for perm occ after p/w and plumbing go perm 4/18/2005 3:51:41 PM
|
FIRE-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
FIRE-Final Inspection | 4/13/2005 | 4/14/2005 | 4/14/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide ada approved hardware for the pocket door
|
BLD-Energy code compliance | 2/14/2005 | 2/15/2005 | 2/15/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/14/2005 at 6:02:48 PM. Contact: ###-####.
|
BLD-Wall cover | 2/14/2005 | 2/15/2005 | 2/15/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/14/2005 at 6:02:20 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/11/2005 | 2/14/2005 | 2/14/2005 | P | PASS |
Dave Hannah
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate 2/15/2005 7:52:06 AM
|
BLD-Foundation | 11/2/2004 | 11/2/2004 | 11/2/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/2/2004 at 9:25:18 AM. Contact: ###-####.
|
BLD-Footing | 11/1/2004 | 11/1/2004 | 11/1/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/1/2004 at 8:42:58 AM. Contact: setbacks ok subgrade ok 11/1/2004 1:30:24 PM
|