BLD-Final | 11/30/2005 | 12/5/2005 | 12/5/2005 | A | PASS |
Jim Sly
|
|
|
cliff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore At time of final inspection.....the homeowner had installed post and beams under connection point of new cover to fascia (which was not per appr plan). This was a fix because he did not carry the roof load off the existing house wall.
|
DOC - Permit Finaled | 12/5/2005 | 12/5/2005 | 12/5/2005 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 6/30/2005 | 7/1/2005 | 7/1/2005 | A | PART |
Jim Sly
|
|
|
ext 2008///cliff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Extension 180 days OK
|
Extend Permit 180 days | 7/1/2005 | 7/1/2005 | 7/1/2005 | P | PASS |
Jim Sly
|
|
|
ext 2008///cliff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Customer asked for Ext.
|
BLD-Framing/Rough-in | 12/20/2004 | 12/27/2004 | 12/27/2004 | A | FAIL |
Lane Manuel
|
|
|
Cliff; Phone #: ###-#### Internet Inspection Request from: Jan Rice
left c/n on site 12/27/2004 10:42:44 AM
|