BLD-Final | 12/20/2004 | 12/20/2004 | 12/20/2004 | P | NR |
Tony Young
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 11/19/2004 | 11/19/2004 | 11/19/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/19/2004 at 9:58:25 AM. OK TO COVER 11/19/2004 1:13:26 PM
|
BLD-Conference | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/15/2004 at 3:18:56 PM. idaho power needs to move power pole so they can finish roof windows were down sized and are on backorder out about tow weeks 11/16/2004 9:20:14 AM
|
BLD-Framing/Rough-in | 11/16/2004 | 11/16/2004 | 11/16/2004 | P | PART |
Dave Hannah
|
|
|
ok to insulate two windows are on back order roof will be finished after Idaho pw mover pole talked with owner and contractor about water damage they will remove anything if it gets wet 11/16/2004 2:58:54 PM
|
BLD-Framing/Rough-in | 11/15/2004 | 11/15/2004 | 11/15/2004 | P | FAIL |
Dave Hannah
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Jan Rice c/n on site needs seal package windows truss engin ect no inspection done at this time 11/15/2004 1:07:10 PM
|
BLD-Wall cover | 10/5/2004 | 10/6/2004 | 10/6/2004 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/5/2004 at 4:39:23 PM. Contact: ###-####.
|
BLD-Footing | 9/13/2004 | 9/13/2004 | 9/13/2004 | P | PART |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles column ftgs off east side of garage 9/13/2004 1:16:06 PM
|
BLD-Foundation | 9/7/2004 | 9/8/2004 | 9/8/2004 | P | PASS |
Dave Hannah
|
|
|
jim cell ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 9/1/2004 | 9/2/2004 | 9/2/2004 | A | PASS |
Dave Hannah
|
|
|
jim--stucture house in alley; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|