BLD-Final | 5/31/2005 | 6/1/2005 | 6/1/2005 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 4:40:43 PM. Contact: ###-####.
|
BLD-Grading Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 | | BOND |
|
|
|
The rough grading and drainage has been completed. The final grading must be completed and for this the engineer has recommended a $1,000.00 bond to ensure satisfactory completion. The grading and drainage can be conditionally approved upon receipt of a $1,000.00 bond.
|
DOC - Permit Finaled | 6/1/2005 | 6/1/2005 | 6/1/2005 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 4:40:43 PM. Contact: ###-####.
|
BLD-Final | 5/27/2005 | 5/31/2005 | 5/31/2005 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/27/2005 at 3:30:55 PM. Contact: ###-####.
|
BLD-Final | 5/26/2005 | 5/27/2005 | 5/27/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/26/2005 at 7:38:03 PM. Contact: ###-####.
|
BLD-Foundation | 5/26/2005 | 5/26/2005 | 5/26/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/26/2005 at 7:18:24 AM. Contact: ###-####.retaining wall front
|
BLD-Foundation | 4/18/2005 | 4/18/2005 | 4/18/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/18/2005 at 7:25:07 AM. Contact: ###-####.stairwell and retaining wall 4/18/2005 10:34:09 AM
|
BLD-Foundation | 4/6/2005 | 4/7/2005 | 4/7/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/6/2005 at 7:38:53 AM. Contact: ###-####.
|
BLD-Footing | 4/6/2005 | 4/6/2005 | 4/6/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/6/2005 at 7:38:28 AM. Contact: ###-####.
|
BLD-Foundation | 4/5/2005 | 4/6/2005 | 4/6/2005 | P | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 7:37:43 AM. Contact: ###-####.
|
BLD-Footing | 4/5/2005 | 4/5/2005 | 4/5/2005 | P | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 7:37:28 AM. Contact: ###-####.
|
BLD-Grading Inspection | 4/5/2005 | 4/5/2005 | 4/5/2005 | | DONE |
|
|
|
footing subgrade for stairway and retaining wall has been approved by the geotechnical engineer.
|
BLD-Foundation | 4/1/2005 | 4/4/2005 | 4/4/2005 | P | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/1/2005 at 7:14:21 AM. Contact: ###-####.
|
BLD-Footing | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/1/2005 at 7:14:06 AM. Contact: ###-####. need soils report approval from public works 4/1/2005 3:53:32 PM
|
BLD-Framing/Rough-in | 2/3/2005 | 2/4/2005 | 2/4/2005 | P | PASS |
Tony Young
|
|
|
###-####- erik
energy code ok also 2/4/2005 3:08:05 PM
|
BLD-Framing/Rough-in | 2/1/2005 | 2/2/2005 | 2/2/2005 | A | CANC |
Tony Young
|
|
|
Eric; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 2/2/2005 | 2/2/2005 | 2/2/2005 | P | FAIL |
Tony Young
|
|
|
Eric; Phone #: ###-#### Internet Inspection Request from: Jan Rice
c/n posted 2/2/2005 2:07:52 PM
|
BLD-Framing/Rough-in | 1/31/2005 | 2/1/2005 | 2/1/2005 | A | FAIL |
Dave Hannah
|
|
|
Eric; Phone #: ###-#### Internet Inspection Request from: Jan Rice c/n on site do not insulate 2/1/2005 11:22:07 AM
|
BLD-Framing/Rough-in | 1/26/2005 | 1/27/2005 | 1/27/2005 | P | FAIL |
Tony Young
|
|
|
###-#### - eric
need trades 1st,,, seal package 1/27/2005 3:45:42 PM
|
BLD-Framing/Rough-in | 1/14/2005 | 1/14/2005 | 1/14/2005 | P | PART |
Dave Hannah
|
|
|
shear inspection please///derrick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover ext 1/14/2005 4:18:59 PM
|
BLD-Framing/Rough-in | 1/11/2005 | 1/12/2005 | 1/12/2005 | A | CANC |
Dave Hannah
|
|
|
Eric; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 1/12/2005 | 1/12/2005 | 1/12/2005 | P | FAIL |
Dave Hannah
|
|
|
Eric; Phone #: ###-#### Internet Inspection Request from: Jan Rice missing hd14s on column in front of garage still havent installed mst strapes and panals not staped per eng schdule 1/12/2005 1:07:58 PM
|
BLD-Framing/Rough-in | 1/10/2005 | 1/10/2005 | 1/10/2005 | P | FAIL |
Troy James
|
|
|
shear inspection please///###-#### eric
shear not complete and no mst straps per plans 1/10/2005 2:00:49 PM
|
BLD-Foundation | 9/28/2004 | 9/28/2004 | 9/28/2004 | P | PART |
Tony Young
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 9/27/2004 | 9/27/2004 | 9/27/2004 | P | PART |
Tony Young
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
wip,,, retaining walls, etc, need to see again 9/27/2004 2:45:22 PM
|
BLD-Footing | 9/22/2004 | 9/22/2004 | 9/22/2004 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/22/2004 at 7:34:13 AM.
wip 9/22/2004 1:58:33 PM
|
BLD-Grading Inspection | 9/16/2004 | 9/16/2004 | 9/16/2004 | | PASS |
|
|
|
Footing subgrade has been approved by the geotechnical engineer. however, limited near surface soils (less than 4 inches) must be removed by hand following the placement of forms and immediately prior to placement of concrete.
|