BLD-Final | 2/24/2005 | 2/25/2005 | 2/25/2005 | A | PASS |
Dave Hannah
|
|
|
Dave; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Final | 2/18/2005 | 2/22/2005 | 2/22/2005 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/18/2005 at 10:46:53 AM. Contact: ###-####. needs three sets of hand rails two on out side setps and a gaurd and hand rail on stairs into basement 2/22/2005 9:39:35 AM
|
FIRE-Alarm Testing | 2/18/2005 | 2/22/2005 | 2/22/2005 | A | CANC |
Troy Cobbley
|
|
|
Fire life safety sign off not required 2/22/2005 9:18:32 AM
|
FIRE-Final Inspection | 2/18/2005 | 2/22/2005 | 2/22/2005 | A | CANC |
Troy Cobbley
|
|
|
Fire life safety not required 2/22/2005 9:19:22 AM
|
BLD-Energy code compliance | 11/2/2004 | 11/3/2004 | 11/3/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 11/2/2004 at 10:48:34 PM.
|
BLD-Framing/Rough-in | 10/28/2004 | 10/28/2004 | 10/28/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/28/2004 at 8:26:48 AM. ok to insulate 10/28/2004 12:16:33 PM
|
BLD-Framing/Rough-in | 10/19/2004 | 10/20/2004 | 10/20/2004 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/19/2004 at 11:00:29 PM. needs seal package installed and elec r/i 10/20/2004 9:02:28 AM
|
BLD-Foundation | 8/25/2004 | 8/26/2004 | 8/26/2004 | A | DONE |
Tony Young
|
|
|
rolled over,, ###-####
|
BLD-Foundation | 8/25/2004 | 8/25/2004 | 8/25/2004 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/25/2004 at 7:40:48 AM. Contact: ###-####.
|
BLD-Footing | 8/24/2004 | 8/24/2004 | 8/24/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/24/2004 at 7:20:21 AM. Contact: ###-####. set back and cover ok crew still needs to install rebar 8/24/2004 2:06:54 PM
|