BLD-Aging Inspection | 1/15/2009 | 1/15/2009 | 1/15/2009 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/5/2008 | 11/5/2008 | 11/5/2008 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/15/2008 | 8/15/2008 | 8/20/2008 | P | PASS |
Dave Hannah
|
|
|
randy Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 8/18/2008 | 8/18/2008 | 8/18/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 8/15/2008 | 8/15/2008 | 8/18/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Aging Inspection | 8/14/2008 | 8/14/2008 | 8/15/2008 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/28/2008 | 1/28/2008 | 1/30/2008 | P | PART |
Forrest France
|
|
|
Pending repair of EM lights at some locations, project related sprinkler permit has been set for final.
|
BLD-Aging Inspection | 1/21/2008 | 1/21/2008 | 1/28/2008 | | DEFR |
Dave Hannah
|
|
|
needs fire finals
|
BLD-Aging Inspection | 9/12/2007 | 9/12/2007 | 9/17/2007 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 4/11/2006 | 4/12/2006 | 4/17/2006 | A | DONE |
Forrest France
|
|
|
wip, pending alarm and sprinkler permit finals.
|
BLD-Final | 3/2/2005 | 3/3/2005 | 3/3/2005 | A | CANC |
Dave Hannah
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok for temp occ 2/28/2005 1:03:39 PM
|
BLD-Final | 3/1/2005 | 3/1/2005 | 3/1/2005 | A | CANC |
Dave Hannah
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok for temp occ 2/28/2005 1:03:39 PM
|
FIRE-Conference | 3/1/2005 | 3/1/2005 | 3/1/2005 | P | DONE |
Troy Cobbley
|
|
|
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
|
BLD-Final | 2/28/2005 | 2/28/2005 | 2/28/2005 | A | CANC |
Dave Hannah
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok for temp occ 2/28/2005 1:03:39 PM
|
BLD-Final | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | NR |
Dave Hannah
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Jan Rice needs fire sign off 2/28/2005 9:17:47 AM
|
FIRE-Final Inspection | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled for monday morning 2/25/2005 4:01:38 PM
|
BLD-Framing/Rough-in | 1/26/2005 | 1/27/2005 | 1/27/2005 | A | PART |
Jim Storey
|
|
|
dale Note: sizemic t-bar ceiling ins; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles perimitor offices ceillings ok 6th floor 1/27/2005 3:13:03 PM
|
BLD-Framing/Rough-in | 12/30/2004 | 1/3/2005 | 1/3/2005 | A | PART |
Dave Hannah
|
|
|
Dale; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok to cover restroom walls and shaft 1/3/2005 11:57:22 AM
|
BLD-Framing/Rough-in | 12/29/2004 | 12/30/2004 | 12/30/2004 | A | PART |
Dave Hannah
|
|
|
DALE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover out wall of open shaf section 12/30/2004 10:13:16 AM
|
BLD-Framing/Rough-in | 12/27/2004 | 12/27/2004 | 12/27/2004 | P | PART |
Dave Hannah
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles plumbing pin. in floor 6th ok to cover walls 12/27/2004 2:48:01 PM
|
BLD-Framing/Rough-in | 12/22/2004 | 12/23/2004 | 12/23/2004 | P | PART |
Dave Hannah
|
|
|
Dale; Phone #: ###-#### Internet Inspection Request from: Jan Rice fire stopping at 2hr floor ok up to 2inch pvc but need new ul listings on 3 inch and above ok to cover walls without plumbing in thim 12/23/2004 7:33:53 PM
|
BLD-Framing/Rough-in | 12/20/2004 | 12/21/2004 | 12/21/2004 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 2:38:05 PM. Contact: ###-####. out of time reschduled for pm 12/21/2004 11:59:18 AM
|
BLD-Framing/Rough-in | 12/21/2004 | 12/21/2004 | 12/21/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 2:38:05 PM. Contact: ###-####. needs 12/21/2004 3:30:26 PM
|
BLD-Final | 3/8/2005 | 3/8/2005 | | P | |
Dave Hannah
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok for temp occ 2/28/2005 1:03:39 PM
|