BLD-Final | 8/24/2005 | 8/24/2005 | 8/25/2005 | P | PASS |
Jim Sly
|
|
|
All others have finaled project; please let me know if you can give it your final approval, too. Thanks : ) OK for Perm Occ. (): :()
|
Permanent Occupancy | | 8/25/2005 | 8/25/2005 | | DONE |
|
|
|
|
BLD-Other | 7/28/2005 | 7/29/2005 | 7/29/2005 | A | NR |
Jim Sly
|
|
|
jonothan// said per your request; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Need Public works, Fire, and Mech (Air Care) finals prior to struct final. (for Perm)
|
FIRE-Conference | 7/29/2005 | 7/29/2005 | 7/29/2005 | P | DONE |
Forrest France
|
|
|
Spoke with Jonathan at ###-#### and informed him the FIR and BLD life safety portions of this project have been finaled. I also made him aware that the MEC, ACH, and PLM permits are still showing in the "issued" status.
|
BLD-Final | 6/23/2005 | 6/23/2005 | 6/23/2005 | P | PART |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK for Temp Occ. C/N...... Firestop plastic pipe penitrations thru 1hr walls, Install approved lever door hardware at retail/storage and restrooms, Need Mech and Public works to sign for Perm Occ, Obtain Perm Occ. status within 90 days of this notice.
|
BLD-Final | 6/22/2005 | 6/23/2005 | 6/23/2005 | A | NR |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need Public works sign off.
|
FIRE-Final Inspection | 6/22/2005 | 6/23/2005 | 6/23/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled, unapproved door hardware at two locations has been removed per agreement.
|
FIRE-Final Inspection | 6/22/2005 | 6/22/2005 | 6/22/2005 | P | FAIL |
Forrest France
|
|
|
HVAC RTU at northeast corner of building failed to shut down upon smoke detection, all remaining life safety issues are satisfactory.
|
FIRE-Final Inspection | 6/20/2005 | 6/20/2005 | 6/20/2005 | P | FAIL |
Forrest France
|
|
|
Missing door hardware, need to test duct smoke detectors, exit discharge lighting not working, missing max occ. signs, need to test hood system which is not ready.
|
BLD-Conference | 5/27/2005 | 5/31/2005 | 5/31/2005 | A | PART |
Jim Sly
|
|
|
bill ###-#### says per dixie's request Met with Bill....Showed him where we need firecaulking at floor/ceiling assembly. Told Dixie that Bldg is not fire sprinklered and dampers need to be installed at floor/ceiling assembly.
|
BLD-Conference | 5/25/2005 | 5/26/2005 | 5/27/2005 | A | NR |
Jim Sly
|
|
|
bill ###-####
|
BLD-Framing/Rough-in | 5/25/2005 | 5/25/2005 | 5/25/2005 | P | NR |
Jim Sly
|
|
|
ceiling grid inspection please///###-#### bill
|
BLD-Framing/Rough-in | 5/23/2005 | 5/24/2005 | 5/24/2005 | A | NR |
Jim Sly
|
|
|
###-#### bill Wants inspection of Ceiling grid, but not going to approve W/O all penitrations above firecaulked. 5/24/2005 11:33:25 AM
|
FIRE-Conference | 5/16/2005 | 5/16/2005 | 5/16/2005 | P | DONE |
Troy Cobbley
|
|
|
I spoke to the general contractor about requirements for a fire alarm system. The plan review comments were missing several pages but it appears it is not a requirement in the sheets that I looked at.
|
FIRE-Conference | 5/11/2005 | 5/12/2005 | 5/12/2005 | P | FAIL |
Troy Cobbley
|
|
|
bill ; Phone #: ###-#### Could not make contact either on the phone or at the project site.
|
BLD-Conference | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | DONE |
Jim Sly
|
|
|
per your request See inspectors notes at BLD04- 01051. 4/29/2005 12:37:44 PM
|
BLD-Conference | 4/14/2005 | 4/15/2005 | 4/15/2005 | A | CANC |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 4/11/2005 | 4/12/2005 | 4/12/2005 | A | NR |
Jim Sly
|
|
|
bill ###-#### Complete Corr. 4/12/2005 11:05:20 AM
|
BLD-Framing/Rough-in | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | FAIL |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N posted. 4/4/2005 3:14:47 PM
|