Tenant Improvement - To finish and complete a 3876 sq. ft. space for the Europe Delicious Bakery on the first floor of an exsiting shell building which includes a 900 sq. ft. store room, 960 sq. ft. mercantile, 880 sq. ft. kitchen, 700 sq. ft. cafe and 436 sq. ft. of restrooms and support areas in accordance with the approved plans and attachments. 4/28/2005 - PLAN MODIFICATION. This permit is being modified to include the remaining 2,076 sq. ft. future tenant space on the first floor. The bakery will occupy the entire first floor with a total of 5,952 sq. ft. The newly added 2, 076 sq. ft. area will be used for a banquet room in conjunction with the deli. All work per approved modified plans. Note the approved plans also include the residence on the second floor which is under tenant improvement permit BLD05--01060.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/24/20058/24/20058/25/2005PPASS
DetailsJim Sly
All others have finaled project; please let me know if you can give it your final approval, too. Thanks : )
OK for Perm Occ. (): :()
Permanent Occupancy 8/25/20058/25/2005 DONE
Details
BLD-Other7/28/20057/29/20057/29/2005ANR
DetailsJim Sly
jonothan// said per your request; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Need Public works, Fire, and Mech (Air Care) finals prior to struct final. (for Perm)
FIRE-Conference7/29/20057/29/20057/29/2005PDONE
DetailsForrest France
Spoke with Jonathan at ###-#### and informed him the FIR and BLD life safety portions of this project have been finaled. I also made him aware that the MEC, ACH, and PLM permits are still showing in the "issued" status.
BLD-Final6/23/20056/23/20056/23/2005PPART
DetailsJim Sly
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
OK for Temp Occ. C/N...... Firestop plastic pipe penitrations thru 1hr walls, Install approved lever door hardware at retail/storage and restrooms, Need Mech and Public works to sign for Perm Occ, Obtain Perm Occ. status within 90 days of this notice.
BLD-Final6/22/20056/23/20056/23/2005ANR
DetailsJim Sly
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Need Public works sign off.
FIRE-Final Inspection6/22/20056/23/20056/23/2005APASS
DetailsForrest France
Fire life safety finaled, unapproved door hardware at two locations has been removed per agreement.
FIRE-Final Inspection6/22/20056/22/20056/22/2005PFAIL
DetailsForrest France
HVAC RTU at northeast corner of building failed to shut down upon smoke detection, all remaining life safety issues are satisfactory.
FIRE-Final Inspection6/20/20056/20/20056/20/2005PFAIL
DetailsForrest France
Missing door hardware, need to test duct smoke detectors, exit discharge lighting not working, missing max occ. signs, need to test hood system which is not ready.
BLD-Conference5/27/20055/31/20055/31/2005APART
DetailsJim Sly
bill ###-#### says per dixie's request
Met with Bill....Showed him where we need firecaulking at floor/ceiling assembly. Told Dixie that Bldg is not fire sprinklered and dampers need to be installed at floor/ceiling assembly.
BLD-Conference5/25/20055/26/20055/27/2005ANR
DetailsJim Sly
bill ###-####
BLD-Framing/Rough-in5/25/20055/25/20055/25/2005PNR
DetailsJim Sly
ceiling grid inspection please///###-#### bill
BLD-Framing/Rough-in5/23/20055/24/20055/24/2005ANR
DetailsJim Sly
###-#### bill Wants inspection of Ceiling grid, but not going to approve W/O all penitrations above firecaulked. 5/24/2005 11:33:25 AM
FIRE-Conference5/16/20055/16/20055/16/2005PDONE
DetailsTroy Cobbley
I spoke to the general contractor about requirements for a fire alarm system. The plan review comments were missing several pages but it appears it is not a requirement in the sheets that I looked at.
FIRE-Conference5/11/20055/12/20055/12/2005PFAIL
DetailsTroy Cobbley
bill ; Phone #: ###-#### Could not make contact either on the phone or at the project site.
BLD-Conference4/28/20054/29/20054/29/2005ADONE
DetailsJim Sly
per your request See inspectors notes at BLD04- 01051. 4/29/2005 12:37:44 PM
BLD-Conference4/14/20054/15/20054/15/2005ACANC
DetailsJim Sly
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in4/11/20054/12/20054/12/2005ANR
DetailsJim Sly
bill ###-#### Complete Corr. 4/12/2005 11:05:20 AM
BLD-Framing/Rough-in4/4/20054/4/20054/4/2005PFAIL
DetailsJim Sly
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N posted. 4/4/2005 3:14:47 PM