BLD-Conference | 2/2/2005 | 2/3/2005 | 2/3/2005 | P | DONE |
Tony Young
|
|
|
jim; Phone #: ###-####
|
BLD-Conference | 2/1/2005 | 2/2/2005 | 2/2/2005 | P | PASS |
Tony Young
|
|
|
jim; Phone #: ###-####
|
BLD-Conference | 1/31/2005 | 2/1/2005 | 2/1/2005 | P | PART |
Tony Young
|
|
|
Jim
2 non- structural issues ok 2/1/2005 2:16:36 PM
|
BLD-Final | 1/28/2005 | 1/31/2005 | 1/31/2005 | P | PASS |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
final ok 1/31/2005 1:47:13 PM
|
Permanent Occupancy | | 1/31/2005 | 1/31/2005 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 1/26/2005 | 1/27/2005 | 1/27/2005 | A | PASS |
Tony Young
|
|
|
Jim-fireplace; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
FIRE-Final Inspection | 1/21/2005 | 1/21/2005 | 1/21/2005 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 1/21/2005 12:14:48 PM
|
FIRE-Final Inspection | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | FAIL |
Troy Cobbley
|
|
|
I received the layout for the hood appliances but the revised air balance reports still are not approved due to a 458cfm differential 1/20/2005 9:34:55 AM
|
Code Occupancy Approval Temp | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | PART |
Troy James
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice
temp. occupancy ok 1/18/2005 4:21:05 PM
|
FIRE-Final Inspection | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given. Need updated air balance reports and appliance layout 1/18/2005 11:03:04 AM
|
BLD-Final | 1/13/2005 | 1/14/2005 | 1/14/2005 | A | FAIL |
Troy James
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Need trades approval 1/14/2005 2:57:36 PM
|
FIRE-Final Inspection | 1/13/2005 | 1/14/2005 | 1/14/2005 | A | NR |
Troy Cobbley
|
|
|
jim --pending bld fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Conference | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 1:46:00 PM. Contact: ###-####.
w/ 411,,, f/p will not work as built per manf specs 1/7/2005 10:46:20 AM
|
BLD-Other | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 1:47:34 PM. Contact: ###-####.
grid ok 1/7/2005 10:45:33 AM
|
BLD-Wall cover | 12/15/2004 | 12/16/2004 | 12/16/2004 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/15/2004 at 2:29:49 PM. Contact: ###-####.
|
BLD-Energy code compliance | 12/14/2004 | 12/15/2004 | 12/15/2004 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/14/2004 at 2:33:07 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/13/2004 | 12/13/2004 | 12/13/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/13/2004 at 10:51:54 AM. Contact: ###-####. ok to start insulating walls will add fire blocking also talked about wall between rest room and 1hr hood will fur out with metal stud thin and cover with sheet rock 12/13/2004 4:04:40 PM
|
BLD-Other | 12/7/2004 | 12/8/2004 | 12/8/2004 | A | CANC |
Tony Young
|
|
|
shear inspection
|
BLD-Framing/Rough-in | 12/6/2004 | 12/7/2004 | 12/7/2004 | A | PART |
Tony Young
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Jan Rice
ok to insulate underside of roof deck 12/7/2004 9:49:16 AM
|
BLD-Other | 12/7/2004 | 12/7/2004 | 12/7/2004 | P | PART |
Tony Young
|
|
|
Brian, phone# ###-####,,, shear walls
ext. ok 12/8/2004 2:37:55 PM
|
BLD-Framing/Rough-in | 12/3/2004 | 12/3/2004 | 12/3/2004 | P | PART |
Tony Young
|
|
|
brian note: roof nailing; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
roof nailing ok after fixes 12/3/2004 3:45:21 PM
|
BLD-Footing | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/15/2004 at 11:54:57 AM. Contact: ###-####.
freezer ftg,, wip 11/16/2004 10:20:45 AM
|
BLD-Footing | 11/8/2004 | 11/9/2004 | 11/9/2004 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/8/2004 at 11:41:21 AM. Contact: ###-####.
main ftgs 11/9/2004 11:29:34 AM
|
BLD-Footing | 10/27/2004 | 10/28/2004 | 10/28/2004 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/27/2004 at 12:44:57 PM. Contact: ###-####.
interior ftg, soils ok per lou (verbal) w/ strata inc.,, eng. ok'd partial lift on this ftg ( 18") then rest w/ slab 10/28/2004 11:08:59 AM
|
BLD-Other | 10/22/2004 | 10/25/2004 | 10/25/2004 | A | CANC |
Tony Young
|
|
|
brian Note: Storm drain inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
other dept 10/25/2004 11:32:30 AM
|