BLD-Final | 9/27/2004 | 9/27/2004 | 9/27/2004 | P | PASS |
Jim Sly
|
|
|
jewel; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/C issued. 9/27/2004 3:36:31 PM
|
BLD-Foundation | 9/22/2004 | 9/23/2004 | 9/23/2004 | A | PASS |
Jim Sly
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Foundation OK....OK to Pour. 9/23/2004 11:39:45 AM
|
BLD-Footing | 9/20/2004 | 9/21/2004 | 9/21/2004 | A | FAIL |
Jim Sly
|
|
|
kim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/N Met with Ken and told him that he has to excavate more.... removing material that is under existing footing to allow stem wall to extend downward 24" below grade. I told Ken that he had to call for inspection to verify before pouring. 9/21/2004 11:51:14 AM 9/21/2004 12:15:02 PM
|
BLD-Final | 9/14/2004 | 9/15/2004 | 9/15/2004 | A | FAIL |
Jim Sly
|
|
|
ken- ###-#### cell--call 1st before insp--have plans on site C/N Foundation and slab poured W/O inspection.... Contractor removed some backfill, and I verified that Footing/wall is only 12" below finished grade. Need frost protection per appr plan. New slab to slope away from existing structure and new patio. 9/15/2004 11:35:11 AM
|
BLD-Final | 9/13/2004 | 9/14/2004 | 9/14/2004 | A | FAIL |
Jim Sly
|
|
|
ken or ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N Need "stamped" approved plans on site for final insp. 9/14/2004 12:04:48 PM
|