BLD-Final | 1/14/2005 | 1/18/2005 | 1/18/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/14/2005 at 11:25:34 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/15/2004 | 11/16/2004 | 11/16/2004 | P | PART |
Tony Young
|
|
|
David; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
ok to cover unaffected areas,,, c/n still posted,, truss calcs and new energy calcs as built,, stairs to meet code by final 11/16/2004 3:37:42 PM
|
BLD-Framing/Rough-in | 11/11/2004 | 11/12/2004 | 11/12/2004 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/11/2004 at 9:26:50 AM. Contact: ###-####.
c/n posted,, stairs not to code, point load, etc 11/12/2004 12:23:03 PM
|
BLD-Foundation | 10/12/2004 | 10/13/2004 | 10/13/2004 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/12/2004 at 4:10:53 PM. Contact: ###-####.
|
BLD-Footing | 10/11/2004 | 10/12/2004 | 10/12/2004 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 2:56:42 PM. Contact: ###-####.
|
BLD-Footing | 10/11/2004 | 10/12/2004 | 10/12/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 2:59:06 PM. Contact: ###-####.
|