BLD-Final | 5/10/2006 | 5/10/2006 | 5/10/2006 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/10/2006 at 8:10:26 AM. Contact: ###-####. C/C issued. Letter of approval from Pat VanKleek Pinnacle Engineers (stamped)
|
DOC - Permit Finaled | 5/10/2006 | 5/10/2006 | 5/10/2006 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 1/12/2006 | 1/13/2006 | 1/13/2006 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Final | 12/30/2005 | 12/30/2005 | 12/30/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/30/2005 at 11:16:00 AM. Contact: ###-####. OK for Temp Ok for Perm when Fire and Code Enfor Perms
|
FIRE-Final Inspection | 12/30/2005 | 12/30/2005 | 12/30/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Hanneman's permission. Items needing addressing are syncing of the horns, mount map at facp, reverify signals (zone 10), and get the resubmitted plans approved.
|
FIRE-Final Inspection | 12/29/2005 | 12/29/2005 | 12/29/2005 | P | FAIL |
Troy Cobbley
|
|
|
Plug sprinkler heads mounted horizontally in the T.I. space. Reinstall the ball drip at the FDC. Certify the backflow preventor. Relocate the bell to the FDC. Provide above ground hydro test papers. Resubmit fire alarm plans showing the flow switch and tamper switch. Test all of the a/v's. Test all of the elevator functions/recall. Test the access controlled egress doors. Provide map at the FACP. Provide printout of the fire alarm signals. Provide minimum 8.3 AH batteries for the FACP. Life safety is ok to final when all of this is done.
|
Code Occupancy Approval Temp | | | 12/27/2005 | | FAIL |
|
|
|
NEEDS TO BOND FOR INCOMPLETED LANDSCAPE, TOTAL BOND AMOUNT IS $7,397 REQUIRED UNDER DRH04-00237.
|
FIRE-Conference | 12/22/2005 | 12/22/2005 | 12/22/2005 | P | DONE |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 12/22/2005 at 10:35:19 AM. Contact: ###-####.
|
FIRE-Conference | 12/13/2005 | 12/14/2005 | 12/14/2005 | A | DONE |
Troy Cobbley
|
|
|
I spoke to Mike about the requirement for a sprinkler head at the top of the elevator shaft. I referred him to NFPA 13 and its non requirement if shaft is non-combustible and the elevator meets ANSI 17.1
|
BLD-Other | 12/8/2005 | 12/9/2005 | 12/9/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/8/2005 at 6:57:28 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/5/2005 | 10/6/2005 | 10/6/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/5/2005 at 5:08:05 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/20/2005 | 9/21/2005 | 9/21/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/20/2005 at 2:47:54 PM. Contact: ###-####. 4 small areas of ceiling at all 4 corners 2nd flr ( for efis ) OK.
|
BLD-Concrete | 7/28/2005 | 7/28/2005 | 7/28/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/28/2005 at 8:18:33 AM. Contact: ###-####. Last (2) tilt up walls.....OK pending Insp, tests and approvals from MTI.
|
BLD-Concrete | 7/11/2005 | 7/11/2005 | 7/11/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/11/2005 at 8:48:17 AM. Contact: ###-####. Concete tilt up walls.....MTI special inspections on going..... No major discrepancies so far.....Contractor to call for inspections more often.
|
BLD-Footing | 5/18/2005 | 5/18/2005 | 5/18/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/18/2005 at 9:28:13 AM. Contact: ###-####. Special insp on site ...Footings part. 5/18/2005 5:09:41 PM
|