Permit NumberBLD04-02348
StatusFinaled
Name BUILDING SHELL AND CORE
Site Address 950 W BANNOCK ST
Project Name10TH & BANNOCK
Customer Number 
ePlanReviewNo
Description
10th & Bannock Building (Shell & Core ) - To construct a new 182,950 square foot, twelve story concrete and steel framed office and retail, high rise shell and core building and related site improvements. This is a shell and core building only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. The core work to be completed under this permit includes the following: 1st floor - 15,640 sq. ft. The entire first floor, with the exception of the two retail tenant spaces, will be finished under this permit. 2nd floor (intermediate floor) - 6,310 sq. ft. - Open storage floor. 3rd floor - 16,200 sq. ft. The restrooms, corridors, elevator lobbies, conference center and break room will be finished under this permit. 4th thru 12th floors - 16,200 sq. ft. (each floor level) - The restrooms and elevator lobbies will be finished under this permit. There is a recorded ground and air rights agreement between the 10th and Bannock property, the property to the north and the City of Boise. The purpose of this agreement is relocate the assumed property line at the alley to 10'-6" from the 10th and Bannock north property line and to restrict the maximum building height on the north property to 60'-0". This agreement is for the purpose of determining the fire-resistive exterior wall and opening protection requirements for the north exterior wall of the new 10th and Bannock building. All construction per the approved plans and attached comment list. (Grading, Drainage and Foundation permitted under BLD04-01632) JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD - Resubmittal Approved8/8/20068/9/20068/9/2006PPASS
DetailsDave Hannah
Doors are labeled. Call me when you are on your way.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton 20 min fire doors labled
BLD-Final6/14/20066/15/20066/15/2006APART
DetailsDave Hannah
Fire dampers are installed. I think we are done; Phone #: ###-#### Internet Inspection Request from: Bob Thornton fire dampers int floor i.e second ok need 20min tags on doors 2-11 mop rm and com rm
BLD-Final4/28/20065/1/20065/1/2006APART
DetailsDave Hannah
###-#### - bob walked project bob has list of items to be fixed
FIRE-Final Inspection4/27/20064/28/20064/28/2006APASS
DetailsForrest France
Correction notice items have been completed as required, fire life safety is satisfactory, the two doors at the stairway exit discharge ground level shall be verified to meet opening force requirements per IFC 2003 at structural final inspection.
BLD - Resubmittal Approved4/27/20064/28/20064/28/2006PCANC
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bob Thornton bob entered the wrong inspection 4:00 pm 4/28/2006
BLD-Final4/25/20064/27/20064/27/2006PCANC
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bob Thornton Inspection cancelled from web by: Bob Thornton
FIRE-Final Inspection4/25/20064/27/20064/27/2006ACANC
DetailsForrest France
Phone #: ###-#### Internet Inspection Request from: Bob Thornton Inspection cancelled from web by: Bob Thornton
FIRE-Final Inspection4/22/20064/24/20064/24/2006AFAIL
DetailsForrest France
Project is not ready for life safety final at this point due to several issues including covers on smoke detectors, caps on sprinklers, missing escutcheons in the showers/RR, missing ceiling tile at some locations, site work is incomplete, missing FE at the penthouse, non-functional emergency light at womens 7th floor, missing FE 2nd floor, need to add an emergency light at the intermediate floor west exit, the fire command center does not meet the req. min ft2, provide key and map in the knox box, need to test dedicated phone line in the command center, provide signage at the exit door to the alley, egress doors at the ground level stairway discharge may exceed allowable force to open per IFC 2003. Not all items reviewed at this time.
BLD-Other4/14/20064/18/20064/18/2006APASS
DetailsJim Storey
Re-inspect the stair pressurization. Call me with an approx time so I can schedule the other trades to be here.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton pending report apears ok
BLD-Other4/11/20064/11/20064/11/2006PPASS
DetailsDave Hannah
Inspect under floor fire caulk @ elevator lobbies 2nd 5th & 6th.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Grading Inspection4/7/20064/7/20064/7/2006PPART
DetailsDave Hannah
11th floor ceiling cover; Phone #: ###-#### Internet Inspection Request from: Bob Thornton ok to cover
BLD-Other4/4/20064/5/20064/5/2006APASS
DetailsDave Hannah
Pressurization shaft wall between west tower ceiling and penthouse floor; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Wall cover3/30/20063/31/20063/31/2006APART
DetailsDave Hannah
9th floor ceiling cover; Phone #: ###-#### Internet Inspection Request from: Bob Thornton 9th and tenth ceiling grid ok to cover
BLD-Other3/29/20063/30/20063/30/2006APART
DetailsDave Hannah
Inspect 8th for ceiling for cover; Phone #: ###-#### Internet Inspection Request from: Bob Thornton 8th floor cei.ling grid ok and hard lid framing grand level drive through ok
BLD-Energy code compliance3/28/20063/29/20063/30/2006PPART
DetailsDave Hannah
Stair presurization at 2:00pm; Phone #: ###-#### Internet Inspection Request from: Bob Thornton west stair tower duct work needs to be in shaft from 2hr lid to ext wall of pent house also need to check on roof top access out of east tower
FIRE-Conference3/28/20063/29/20063/29/2006PDONE
DetailsForrest France
Stair presurization at 2:00pm; Phone #: ###-#### Internet Inspection Request from: Bob Thornton On site visit to verify stair test compliance with structural inspector.
BLD-Wall cover3/28/20063/28/20063/28/2006APASS
DetailsDave Hannah
re-inspect 11th floor asap ; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Energy code compliance3/27/20063/28/20063/28/2006APASS
DetailsDave Hannah
11th floor insulation. LATE afternoon.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Wall cover3/27/20063/27/20063/27/2006PFAIL
DetailsDave Hannah
11th floor insulation. LATE afternoon.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Wall cover3/23/20063/24/20063/24/2006PPART
DetailsDave Hannah
11th floor framing late afternoon; Phone #: ###-#### Internet Inspection Request from: Bob Thornton ok to insulate ext walls on 11th floor
BLD-Other3/21/20063/22/20063/22/2006APART
DetailsDave Hannah
Ceilings on 5th 6th & 7th; Phone #: ###-#### Internet Inspection Request from: Bob Thornton ok to drop in panels on floors 5,6 and7
BLD-Other3/17/20063/20/20063/20/2006PPART
DetailsDave Hannah
Ceilings 3 thru 6; Phone #: ###-#### Internet Inspection Request from: Bob Thornton ok to cover 3and four only
BLD-Other3/15/20063/16/20063/16/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/15/2006 at 5:42:34 PM. Contact: ###-####.second floor ceiling grid ok to cover
BLD-Wall cover3/13/20063/14/20063/14/2006APART
DetailsDave Hannah
10th floor insulation Call Ray ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton also ok to cover ceilinds in rest room floors 4 thru 7
BLD-Energy code compliance3/10/20063/14/20063/14/2006APART
DetailsDave Hannah
bob ###-#### -- insulation 10th floor ok to cover ext walls
BLD-Framing/Rough-in3/7/20063/9/20063/10/2006PPART
DetailsDave Hannah
bob ###-#### floor fire proofing at curtan wall ok 10th floor
BLD-Wall cover3/3/20063/6/20063/6/2006APART
DetailsDave Hannah
Bob ###-#### 9th floor ok to cover ext walls
BLD-Wall cover2/28/20063/2/20063/2/2006APART
DetailsDave Hannah
Bob ###-#### -- for wall cover 9th floor ok to insulate
BLD-Conference2/28/20062/28/20062/28/2006PPART
DetailsDave Hannah
bob ###-#### fire door jams for stair tower
BLD-Framing/Rough-in2/23/20062/24/20062/24/2006APASS
DetailsDave Hannah
bob ###-#### curtan wall at floor fire stopping on 9/10/and roof ok to cover
BLD-Energy code compliance2/21/20062/21/20062/21/2006PPASS
DetailsDave Hannah
for the 8th floor - bob ###-####
BLD-Framing/Rough-in2/17/20062/17/20062/17/2006PPASS
DetailsTom Arcoraci
wall cover for the 8th floor//bob ###-####
BLD-Conference2/9/20062/10/20062/10/2006APASS
DetailsDave Hannah
425,,,, 415 left you a ph. messege, if you want to verify remainder of insulation,, ?s call 415
BLD-Wall cover2/8/20062/9/20062/9/2006PPART
DetailsTony Young
Call Ray @ ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
7th floor,, fire caulk ok around drains at floor line ok,, most insulation is in wall areas
BLD-Wall cover2/6/20062/6/20062/6/2006PPART
DetailsDave Hannah
7th floor. Scheduled for Friday?? Call Ray ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton ok to insulate needs to fire proof 4inch drain lians at floor line
BLD-Wall cover1/25/20061/25/20061/25/2006PFAIL
DetailsJim Storey
Core 8th up & fire caulk @ stairs Call Ray ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton need conf. with 301 to supply s/f listings/ 1 1/2 door jambs listings/ move all bathrm door jambs to meet ada swing clearances/fire stopping common plm. top floors.
BLD-Other1/24/20061/24/20061/24/2006APASS
DetailsTom Arcoraci
Restrooms & core 8 through 11.Call Ray ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton partial framing at curtain wall area ok
BLD-Wall cover1/20/20061/20/20061/20/2006APART
DetailsDave Hannah
1st layer at east stair tower; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Foundation1/9/20061/9/20061/9/2006APART
DetailsDave Hannah
Fire stop at 5th & 6th. Framing, insulation. Call Ray ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton fouth ok to cover fifth fl ok to frame
BLD-Framing/Rough-in1/5/20061/5/20061/5/2006PNR
DetailsDave Hannah
5th floor fire stop & fire proof repair. Call Ray ###-####.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Wall cover1/4/20061/5/20061/5/2006ANR
DetailsDave Hannah
5th floor fire stop & fire proof repair. Call Ray ###-####.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Wall cover1/3/20061/4/20061/5/2006APART
DetailsDave Hannah
Call Ray ###-#### Penthouse walls. Conference ceiling.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton parapet framing penthouse and 4th floor insulation and framing ok to cover
BLD-Framing/Rough-in12/29/200512/29/200512/29/2005PPART
DetailsDave Hannah
late am early pm 3rd floor insulation, 4th floor fire caulk. Call Ray ###-####.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton 3rd fl insulation and forth fl fire safing around ext ok
BLD-Wall cover12/29/200512/29/200512/29/2005APART
DetailsDave Hannah
late am early pm 3rd floor insulation, 4th floor fire caulk. Call Ray ###-####.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Wall cover12/23/200512/27/200512/27/2005APART
DetailsDave Hannah
Look at floor caulk 3rd & 4th. Call Ray @###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton 3rd floor extwall at floor fire proofing ok
BLD-Wall cover12/22/200512/23/200512/23/2005APART
DetailsDave Hannah
2nd floor wall cover. Penthouse shaft SFD. Call Ray ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton insulation ok on second floor up to top of sheetrock still have a large openning that needs tobe framed and insulated on bannock st side
BLD-Other12/20/200512/20/200512/21/2005APART
DetailsDave Hannah
2nd floor exterior walls. Call Ray @ ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton fire safing around ext at floor line done on sercond floor ok insulate ext walls
BLD-Wall cover12/8/200512/9/200512/9/2005APART
DetailsDave Hannah
Call Ray @ ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton restrooms and north stair tower ok to cover to the ninth floor
BLD-Wall cover12/1/200512/2/200512/2/2005APART
DetailsJim Sly
East stair tower & 2nd floor. Call Ray @###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
Met with Ray. East stair tower appears OK up to 8th Flr. Most of 2nd Flr corridor OK....... will call for insp as they are working on a way to achieve 1hr at steel beams at each end of corridor above doors. I verified that hole in floor at 3rd Flr janitors closet was filled.
BLD-Conference11/22/200511/23/200511/23/2005APART
DetailsDave Hannah
Fire caulk at floor; Phone #: ###-#### Internet Inspection Request from: Bob Thornton restrooms first true fourth ok to cover and ent walls on second floor also ok to cover
BLD-Conference11/15/200511/15/200511/15/2005PPASS
DetailsDave Hannah
Fireproofing at elevator; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Wall cover11/4/200511/4/200511/4/2005PPART
DetailsDave Hannah
Call Ray @ ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton ok to cover restrooms on ground floor
BLD-Conference10/19/200510/20/200510/24/2005PPART
DetailsDave Hannah
Fire Caulk inspection Ray ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton east stair tower and its passage way items around west stair tower wall on mes deck and shaft in center of building
BLD-Conference10/13/200510/14/200510/14/2005APASS
DetailsDave Hannah
Ray with Lombac has questions. ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton shafts and passage way
BLD-Wall cover10/6/200510/6/200510/7/2005PPART
DetailsDave Hannah
Inspect shaft wall system on east tower from 1st to 5th; Phone #: ###-#### Internet Inspection Request from: Bob Thornton east stair tower and elevator from 1st floor to 4th ok to cover
BLD-Energy code compliance9/30/20059/30/200510/3/2005PPART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bob Thornton alley side mez deck ok to cover
BLD-Conference9/27/20059/28/20059/28/2005APASS
DetailsDave Hannah
Framer has some questions. He is here from 7:00 to 3:30.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete9/21/20059/22/20059/22/2005APART
DetailsDave Hannah
Slab on deck 5th floor; Phone #: ###-#### Internet Inspection Request from: Bob Thornton strata on site testing concrete and inspecting
BLD-Wall cover9/21/20059/21/20059/21/2005PPART
DetailsDave Hannah
We may have to move insulation; Phone #: ###-#### Internet Inspection Request from: Bob Thornton walked first floor enterm level looked at ext framing went over fire proofing ok to insulate will check patch work on fire proofing columns and beams and control joints in cmu wall atinsulation inspection
BLD-Concrete8/29/20058/30/20058/31/2005APASS
DetailsDave Hannah
S O G Wed. morning early; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete8/29/20058/29/20058/30/2005PDONE
DetailsDave Hannah
West shear wall to 11. Tues 1:00 pm; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete8/19/20058/19/20058/23/2005PPART
DetailsDave Hannah
Pour west shear wall to 10 Monday.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete8/10/20058/10/20058/11/2005PPART
DetailsDave Hannah
Intermediate floor slab on pan deck.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete8/6/20058/8/20058/8/2005APART
DetailsDave Hannah
East shear wall from 7 to 8.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete7/26/20057/27/20057/27/2005ADONE
DetailsDave Hannah
East shear wall to 7th floor. ; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete7/25/20057/26/20057/27/2005ADONE
DetailsDave Hannah
East shear wall to 7th floor. ; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete7/22/20057/25/20057/25/2005APART
DetailsDave Hannah
East shear wall to 7th floor. ; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
Extend Permit 180 days7/25/20057/26/20057/25/2005ACANC
DetailsDave Hannah
BLD-Concrete7/16/20057/18/20057/18/2005APART
DetailsTony Young
Concrete shear wall, west tower to 7th; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
poured,, special inspector was on site per Bob
BLD-Other7/5/20057/6/20057/6/2005APART
DetailsDave Hannah
Still laying block; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete7/5/20057/6/20057/6/2005APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Other6/29/20056/29/20056/30/2005PPART
DetailsDave Hannah
Masonary grout at 10:00 am.; Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete6/27/20056/28/20056/28/2005APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete6/21/20056/22/20056/23/2005APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete6/20/20056/21/20056/23/2005APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Concrete6/15/20056/17/20056/17/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/15/2005 at 9:41:42 AM. Contact: ###-####.
FIRE-Conference6/13/20056/14/20056/14/2005ADONE
DetailsForrest France
Confrence to discuss fire water supply vault installation under excavation and grading permit.