BLD-Final | 4/5/2005 | 4/6/2005 | 4/6/2005 | A | PASS |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 4/5/2005 | 4/6/2005 | 4/6/2005 | A | PASS |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 4/5/2005 | 4/5/2005 | 4/5/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Framing/Rough-in | 1/13/2005 | 1/13/2005 | 1/13/2005 | P | PART |
Lane Manuel
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Jan Rice
ok to cover bathroom walls, and ceiling following installation of mechanical fan. 1/13/2005 3:02:55 PM
|
BLD-Conference | 10/18/2004 | 10/18/2004 | 10/18/2004 | P | DONE |
Troy Cobbley
|
|
|
Upon inspection of the vanilla finish/demo permit I found numerous sprinkler spacing violations that will need to be addressed before finaling of this permit 10/18/2004 3:44:42 PM
|