BLD-Final | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PASS |
Tony Young
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for perm. c of o
|
Permanent Occupancy | | 9/2/2005 | 9/2/2005 | | DONE |
|
|
|
|
BLD-Final | 8/31/2005 | 9/1/2005 | 9/1/2005 | A | CANC |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles///cancelled by John Edward per not ready, called Tony 9:19 9/1/05 LEM
|
BLD-Final | 8/8/2005 | 8/9/2005 | 8/9/2005 | P | PART |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa temp occ. ok,, need toe kick on ramp,,
|
FIRE-Final Inspection | 8/8/2005 | 8/9/2005 | 8/9/2005 | A | PASS |
Forrest France
|
|
|
Life safety finaled.
|
FIRE-Final Inspection | 7/15/2005 | 7/18/2005 | 7/18/2005 | A | FAIL |
Forrest France
|
|
|
Provide one 2A10BC fire ext. per level with current inspection tag, provide lever hardware and remove thumbturns at both main entry/exit and back doors as discussed and required per note #4 on fire review comments, remove two doors at kittchen area, no storage allowed in attic space per note #2 on plan review report.
|
BLD-Final | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | NR |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need trades 1st,,, also need handrails to return,,, no formal inspection made
|
BLD-Final | 7/13/2005 | 7/14/2005 | 7/14/2005 | P | NR |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need trades 1st
|
BLD-Footing | 3/7/2005 | 3/8/2005 | 3/8/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/7/2005 at 1:38:49 PM. Contact: ###-####.
ftgs for ramp,, wip 3/8/2005 12:03:28 PM
|
BLD-Framing/Rough-in | 3/7/2005 | 3/8/2005 | 3/8/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/7/2005 at 1:40:16 PM. Contact: ###-####.
bathroom framing ok pending trades 3/8/2005 12:04:30 PM
|