BLD-Final | 8/18/2005 | 8/18/2005 | 8/18/2005 | P | PASS |
Jim Sly
|
|
|
harry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/C issued.
|
DOC - Permit Finaled | 8/18/2005 | 8/18/2005 | 8/18/2005 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | FAIL |
Jim Sly
|
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N posted.
|
BLD-Framing/Rough-in | 5/4/2005 | 5/4/2005 | 5/4/2005 | P | PART |
Jim Sly
|
|
|
per george Complaint. Not per site plan. Met with Brandon Haun..... We measured.... Setbacks appear OK /4/2005 11:58:00 AM 5/4/2005 12:00:00 PM
|
BLD-Foundation | 4/20/2005 | 4/21/2005 | 4/21/2005 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/20/2005 at 7:17:48 AM. Contact: ###-####.
|
BLD-Foundation | 4/21/2005 | 4/21/2005 | 4/21/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 8:00:28 AM. Contact: ###-####.
|
BLD-Footing | 4/20/2005 | 4/20/2005 | 4/20/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/20/2005 at 7:17:11 AM. Contact: ###-####.
|