BLD-Final | 8/31/2005 | 9/1/2005 | 9/1/2005 | P | PASS |
Tony Young
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
DOC - Permit Finaled | 9/1/2005 | 9/1/2005 | 9/1/2005 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 8/22/2005 | 8/23/2005 | 8/23/2005 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/22/2005 at 5:41:39 PM. Contact: ###-####. need f/p inspection,, conf. on final,, seal garage
|
BLD-Final | 8/18/2005 | 8/19/2005 | 8/19/2005 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/18/2005 at 6:14:59 PM. Contact: ###-####. No inspection performed. did not pass publc works final or posted required bond.
|
BLD-Grading Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 | | BOND |
|
|
|
Rough grading is complete however fine grading and restoration of the disturbed hillside must still be done . For this a $1,000.00 bond is required. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Other | 4/25/2005 | 4/26/2005 | 4/26/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/25/2005 at 4:45:30 PM. Contact: ###-####.
int. shear ok 4/26/2005 10:24:08 AM
|
BLD-Wall cover | 4/6/2005 | 4/7/2005 | 4/7/2005 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/6/2005 at 4:59:59 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/30/2005 | 3/31/2005 | 3/31/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/30/2005 at 5:48:20 PM. ok to insulate but needs fireplaces permited an ri s done 3/31/2005 3:23:48 PM
|
BLD-Other | 3/21/2005 | 3/22/2005 | 3/22/2005 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/21/2005 at 9:43:53 AM. Contact: ###-####.
|
BLD-Wall cover | 3/22/2005 | 3/22/2005 | 3/22/2005 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/21/2005 at 9:43:53 AM. Contact: ###-####.\
c/n posted,,, need plans, fix on missed hold down 3/22/2005 1:47:41 PM
|
BLD-Foundation | 12/23/2004 | 12/23/2004 | 12/23/2004 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/23/2004 at 7:22:18 AM.
|
BLD-Footing | 12/21/2004 | 12/21/2004 | 12/21/2004 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/21/2004 at 8:57:46 AM. Contact: ###-####.
|
BLD-Grading Inspection | 12/21/2004 | 12/21/2004 | 12/21/2004 | | DONE |
|
|
|
Footing subgrade has been approved by the geotechnical engineer.
|