BLD-Final | 2/13/2006 | 2/14/2006 | 2/14/2006 | A | PASS |
Dave Hannah
|
|
|
milt ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
DOC - Permit Finaled | 2/14/2006 | 2/14/2006 | 2/14/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 11/7/2005 | 11/7/2005 | 11/7/2005 | P | NR |
Dave Hannah
|
|
|
milt ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa needs mec final no inspection done
|
BLD-Energy code compliance | 5/25/2005 | 5/26/2005 | 5/26/2005 | A | PASS |
Dave Hannah
|
|
|
dal rife; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover
|
BLD-Framing/Rough-in | 5/24/2005 | 5/24/2005 | 5/24/2005 | P | PART |
Dave Hannah
|
|
|
dal rife ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to insulate need engineering for beam change in garage
|
BLD-Wall cover | 4/8/2005 | 4/11/2005 | 4/11/2005 | P | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 10:54:56 AM. shear inspection not required 4/11/2005 1:33:05 PM
|
BLD-Foundation | 3/3/2005 | 3/4/2005 | 3/4/2005 | A | PASS |
Troy James
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 3/1/2005 | 3/2/2005 | 3/2/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/1/2005 at 5:45:54 PM. Contact: ###-####. garage footings 3/2/2005 3:40:38 PM
|
BLD-Foundation | 1/31/2005 | 2/1/2005 | 2/1/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/31/2005 at 3:15:19 PM. Contact: ###-####.
|
BLD-Footing | 1/28/2005 | 1/31/2005 | 1/31/2005 | A | PART |
Troy James
|
|
|
James; Phone #: ###-#### Internet Inspection Request from: Jan Rice contractor to remove dirt that is still pumping first before placing concrete 1/31/2005 10:13:31 AM
|
BLD-Footing | 1/24/2005 | 1/25/2005 | 1/25/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 4:08:45 PM. Contact: ###-####. footing to wet to place concrete 1/25/2005 2:58:38 PM
|