BLD-Final | 2/9/2005 | 2/10/2005 | 2/10/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 12:08:34 PM. Contact: ###-####.
|
Permanent Occupancy | | 2/10/2005 | 2/10/2005 | | DONE |
|
|
|
|
BLD-Final | 2/8/2005 | 2/9/2005 | 2/9/2005 | P | CANC |
Dave Hannah
|
|
|
Richard; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
FIRE-Final Inspection | 2/8/2005 | 2/8/2005 | 2/8/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 2/8/2005 12:25:08 PM
|
BLD-Other | 1/27/2005 | 1/27/2005 | 1/27/2005 | A | PASS |
Jim Storey
|
|
|
c/n ok
|
BLD-Framing/Rough-in | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | FAIL |
Tom Arcoraci
|
|
|
cieling cover inspection please///richard; Phone #: ###-#### Internet Inspection Request from: Barbara Moore install grid per ssheet a-3 on approved plan 1/26/2005 9:52:49 AM
|
BLD-Conference | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | PART |
Jim Storey
|
|
|
richard; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie p/l wall opening protection required/ not required on tennet wall. 1/20/2005 11:02:05 AM
|
BLD-Framing/Rough-in | 1/7/2005 | 1/10/2005 | 1/10/2005 | A | PASS |
Dave Hannah
|
|
|
###-#### - richard ok to cover int walls 1/10/2005 9:13:47 AM
|
BLD-Framing/Rough-in | 1/5/2005 | 1/6/2005 | 1/6/2005 | A | NR |
Jim Storey
|
|
|
richard; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs plm permit and insp. 1/6/2005 9:36:21 AM
|
BLD-Conference | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | PASS |
Jim Storey
|
|
|
richard-- ###-#### --call 1st before insp
|
FIRE-Conference | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | PART |
Rick Jackson
|
|
|
richard ###-#### call 1st before insp MEt with GC about final - need shell signed off; verify HVAC for duct detector if required; exit sign not needed at door in hallway (approved plans show sign on one side and his plans show on the other side) 1/4/2005 12:07:34 PM
|