BLD-Final | 6/29/2005 | 6/30/2005 | 6/30/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/29/2005 at 12:37:10 PM. Contact: ###-####. C/C issued.
|
BLD-Conference | 6/29/2005 | 6/30/2005 | 6/30/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/29/2005 at 12:38:02 PM. Contact: ###-####.Talked with Steve about drainage from back of house....appears to be OK now.
|
BLD-Final | 6/28/2005 | 6/28/2005 | 6/28/2005 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/28/2005 at 11:26:10 AM. Contact: ###-####. C/N...posted.
|
BLD-Energy code compliance | 3/10/2005 | 3/11/2005 | 3/11/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/10/2005 at 9:46:13 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/10/2005 | 3/10/2005 | 3/10/2005 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/10/2005 at 9:45:26 AM. Contact: ###-####. C/N posted. 3/10/2005 2:24:50 PM
|
BLD-Foundation | 1/14/2005 | 1/18/2005 | 1/18/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/14/2005 at 9:22:12 AM. Contact: ###-####.
|
BLD-Footing | 1/14/2005 | 1/14/2005 | 1/14/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/14/2005 at 9:21:37 AM. Contact: ###-####. MG W Ustick L Dalton. 1/14/2005 1:46:42 PM
|