BLD-Final | 6/24/2005 | 6/28/2005 | 6/29/2005 | A | PASS |
Jim Sly
|
|
|
dave williams-- ###-#### OK for Perm Occ.
|
Permanent Occupancy | | 6/29/2005 | 6/29/2005 | | DONE |
|
|
|
|
BLD-Final | 1/19/2005 | 1/20/2005 | 1/20/2005 | P | PART |
Jim Sly
|
|
|
please call dave at ###-#### for access information; Internet Inspection Request from: Barbara Moore OK for Temp Occ. only....... No life/Safety issues with shell/core. Shell/core not finaled yet, as each tenant is requesting restrooms in each T I in leiu of a central common restroom area. Thats why this is messed up. 1/20/2005 3:11:36 PM
1/20/2005 3:12:37 PM 1/20/2005 3:17:42 PM
|
FIRE-Final Inspection | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled. Contractor to have correct sticker at main exit for structural. Per A-1 heating the hvac system is a 3 ton unit which is 1200 cfm which won't need the duct smoke detector. 1/20/2005 8:50:56 AM
|
BLD-Framing/Rough-in | 12/14/2004 | 12/14/2004 | 12/14/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/14/2004 at 11:28:17 AM. Contact: ###-####.
|