BLD-Final | 3/1/2005 | 3/2/2005 | 3/2/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/1/2005 at 8:38:57 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/7/2005 | 1/7/2005 | 1/7/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/7/2005 at 10:40:48 AM. Contact: ###-####. Energy OK 1/7/2005 3:15:37 PM
|
BLD-Framing/Rough-in | 12/27/2004 | 12/30/2004 | 12/30/2004 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/27/2004 at 11:34:53 AM. Contact: ###-####. Need all R/Is 12/30/2004 10:43:39 AM
|