BLD-Final | 4/7/2010 | 4/8/2010 | 4/8/2010 | P | PASS |
Jim Sly
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 4/8/2010 | 4/8/2010 | 4/8/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 5/5/2006 | 5/5/2006 | 5/5/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/5/2006 at 12:13:37 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/23/2005 | 12/27/2005 | 12/27/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/23/2005 at 12:14:48 PM. Contact: ###-####. Checked framing at 22 sq ft add and Bsmnt. OK Sub that has entry at N side of Nazarene Church on Eagle Rd.
|
BLD-Footing | 5/27/2005 | 5/27/2005 | 5/27/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/27/2005 at 6:54:51 AM. Contact: ###-####. Eagle rd to Westchester Pl.
|