BLD-Final | 6/16/2005 | 6/17/2005 | 6/17/2005 | A | PASS |
Tom Arcoraci
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesaerm ok for perm occ
|
Permanent Occupancy | | 6/17/2005 | 6/17/2005 | | DONE |
|
|
|
|
BLD-Final | 6/1/2005 | 6/2/2005 | 6/2/2005 | P | PART |
Dave Hannah
|
|
|
robbie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for temp occ need to install temp glass ok for perm after that
|
FIRE-Final Inspection | 6/1/2005 | 6/3/2005 | 6/2/2005 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
FIRE-Final Inspection | 6/2/2005 | 6/2/2005 | 6/2/2005 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 5/27/2005 | 5/27/2005 | 5/27/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide suite number, provide signage or painting of the curbing for fire dept access and provide locking hardware that has the indicators.
|
BLD-Energy code compliance | 3/3/2005 | 3/4/2005 | 3/4/2005 | P | PASS |
Troy James
|
|
|
Robby-; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 3/3/2005 | 3/3/2005 | 3/3/2005 | P | FAIL |
Troy James
|
|
|
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c/n posted ok to cover ext. walls 3/3/2005 4:17:33 PM
|
BLD-Framing/Rough-in | 2/22/2005 | 2/23/2005 | 2/23/2005 | A | PART |
Dave Hannah
|
|
|
robbie///shear inspection please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore roof ok to cover 2/23/2005 1:06:39 PM
|
BLD-Footing | 1/24/2005 | 1/25/2005 | 1/25/2005 | A | PART |
Lane Manuel
|
|
|
steve ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
stemwalls ok.
Note: # 4 rebar Ufer in footings 1/25/2005 10:46:06 AM
|