BLD-Final | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 4:11:51 PM. Contact: ###-####. OK for Perm Occ. :)
|
Permanent Occupancy | | 6/7/2005 | 6/7/2005 | | DONE |
|
|
|
|
BLD-Final | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | NR |
Dave Hannah
|
|
|
###-#### - JIM needs plumb final and doors and windows installed no inspection done
|
BLD-Final | 6/3/2005 | 6/6/2005 | 6/6/2005 | A | NR |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
FIRE-Final Inspection | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
FIRE-Final Inspection | 6/3/2005 | 6/6/2005 | 6/6/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Final | 6/2/2005 | 6/3/2005 | 6/3/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/2/2005 at 4:42:14 PM. Contact: ###-####.
|
FIRE-Final Inspection | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | FAIL |
Troy Cobbley
|
|
|
Need indicator for the lock at the main exit. No racking has been installed. Need suite number.
|
BLD-Other | 5/23/2005 | 5/23/2005 | 5/23/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/23/2005 at 10:53:17 AM. Contact: ###-####. Grid OK. 5/23/2005 4:19:41 PM
|
BLD-Framing/Rough-in | 4/27/2005 | 4/27/2005 | 4/27/2005 | P | PASS |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Frame and Energy OK. Small space at N.W. corner of bldg..... Just E of Gem state supply. 4/27/2005 4:20:04 PM 4/27/2005 4:20:39 PM
|