BLD-Final | 8/12/2005 | 8/16/2005 | 8/17/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/12/2005 at 3:06:48 PM. Contact: ###-####. ok for cc
|
DOC - Permit Finaled | 8/17/2005 | 8/17/2005 | 8/17/2005 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Framing/Rough-in | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/22/2005 at 4:24:19 PM. Contact: ###-####. ceiling grid ok to cover
|
BLD-Framing/Rough-in | 4/20/2005 | 4/21/2005 | 4/21/2005 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/20/2005 at 8:03:33 AM. Contact: ###-####. ceiling grid needs3/8 inedges and prem wires 4/21/2005 10:38:53 AM
|
BLD-Framing/Rough-in | 4/7/2005 | 4/7/2005 | 4/7/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 7:40:14 AM. Contact: ###-####. ceiling grid not per plan 4/8/2005 8:14:26 AM
|
BLD-Framing/Rough-in | 3/7/2005 | 3/7/2005 | 3/7/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/7/2005 at 11:08:16 AM. Contact: ###-####. ok to cover if ok with fire sprinkler 3/7/2005 2:44:13 PM
|
FIRE-Conference | 3/7/2005 | 3/7/2005 | 3/7/2005 | A | DONE |
Troy Cobbley
|
|
|
Sprinkler piping above the vaulted ceiling in the elevator lobby is ok to cover but will not be finaled until the revized piping size is approved. If piping is not approved all changes will be required to meet approval prior to finaling permit.
|