Permanent Occupancy | | 6/27/2006 | 6/27/2006 | | DONE |
|
|
|
|
BLD-Final | 3/27/2006 | 3/28/2006 | 3/28/2006 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/27/2006 at 9:08:21 AM. Contact: ###-####. OK for Temp...........OK for Perm , When Code Enforce Perms
|
FIRE-Final Inspection | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Energy code compliance | 1/9/2006 | 1/12/2006 | 1/12/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/9/2006 at 1:42:36 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/9/2006 | 1/10/2006 | 1/10/2006 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/9/2006 at 1:41:51 PM. Contact: ###-####.
|
BLD-Footing | 11/15/2005 | 11/15/2005 | 11/15/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/15/2005 at 8:51:24 AM. Contact: ###-####.
|