Permanent Occupancy | | 6/27/2006 | 6/27/2006 | | DONE |
|
|
|
|
BLD-Final | 9/16/2005 | 9/19/2005 | 9/19/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/16/2005 at 10:13:24 AM. Contact: ###-####. OK for Temp Occ OK to final for Perm when Public works and Code enforce finals for Perm Occ. ():
|
FIRE-Final Inspection | 9/16/2005 | 9/19/2005 | 9/19/2005 | A | FAIL |
Forrest France
|
|
|
Door closures on apartments 101, 201, 202 did not operate correctly.
|
FIRE-Final Inspection | 9/19/2005 | 9/19/2005 | 9/19/2005 | P | PASS |
Forrest France
|
|
|
Door closures have been repaired, life safety finaled.
|
BLD-Energy code compliance | 6/29/2005 | 6/30/2005 | 6/30/2005 | A | PASS |
Jim Sly
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 6/27/2005 | 6/27/2005 | 6/28/2005 | P | PASS |
Jim Sly
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 5/3/2005 | 5/3/2005 | 5/3/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/3/2005 at 9:44:38 AM. Contact: ###-####.
|
BLD-Footing | 4/29/2005 | 4/29/2005 | 4/29/2005 | P | FAIL |
Jim Sly
|
|
|
per jim sly Previous inspection passed by mistake..... to call for footing insp. 4/29/2005 2:36:56 PM
|
BLD-Footing | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/28/2005 at 8:27:53 AM. Contact: ###-####.
|
BLD-Foundation | 4/28/2005 | 4/29/2005 | 4/29/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/28/2005 at 4:55:51 PM. Contact: ###-####.
|