Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD04-03025
StatusFinaled
Name B AND A DEVELOPMENT
Site Address 7957 W SPECTRUM ST
Project NameHomewood Suites-Hilton Hotel
Customer Number 
ePlanReviewNo
Description
(HOMEWOOD SUITES-HILTON HOTEL) To construct a new 102,196 sq.ft. 4- story, wood framed, 110 guest room extended stay hotel with a restaurant, lodge area, indoor swimming pool and spa area. The installation of horizontal exits on each floor is used for travel distance to the exits. Note: This building is fully fire sprinklered for area increase. This permit does not include the construction of the swimming poo and related equipment. All construction per the approved plans and attached comment list. Refer to BLD 05-00477 for grading permit. MJP DRH 03-189 CUP 03-00076
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval  8/15/2007 PASS
LANDSCAPE NOW FINISHED OK FOR FINAL AND RELEASE OF BOND.
BLD-Final2/13/20072/14/20072/15/2007PPART
DetailsMike Jordan
troy; Phone #: ###-#### Internet Inspection Request from: Patricia Smit. All issues have been resolved except for issues noted on final Aff. letter from special insp. agency. Noted items must be resolved and approved by structural engineer prior to perm occ.
FIRE-Final Inspection2/14/20072/14/20072/14/2007PPASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final2/8/20072/9/20072/9/2007APART
DetailsMike Jordan
Temp occ granted. Needs to complete some firecaulking on the 3rd and 4th floors, fix grab bars in rooms 219, 104 and pool restroom. Complete firecauling at front desk area. Install safety glazed windows @ stairtower. Will have repaired in two weeks as per contractor.
FIRE-Final Inspection2/7/20072/8/20072/9/2007APART
DetailsTroy Cobbley
Temporary occupancy given until small list of items has been corrected. Per the contractor the inspection is to be called in on Monday. List is with the sign off card.
BLD-Final2/8/20072/8/20072/8/2007PCANC
DetailsMike Jordan
Code Occupancy Approval Temp2/8/20072/8/20072/8/2007PDONE
DetailsScott M.Brown
BOND NEEDED FOR $60,000 LANDSCAPE REF DRH03-00159.
BLD-Final2/7/20072/8/20072/8/2007ANR
DetailsMike Jordan
Spoke with contractor on phone. Still needs to post bond and needs life/safety.
BLD-Final2/7/20072/7/20072/7/2007PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/7/2007 at 10:06:37 AM. Contact: ###-####. Note ready. rescheduled for the am. 2-8-07.
BLD-Framing/Rough-in1/23/20071/24/20071/24/2007APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/23/2007 at 1:34:07 PM. Contact: ###-####. grid appears ok fire stop conduits in kit and west end of corr
BLD-Conference1/22/20071/22/20071/22/2007PDONE
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/22/2007 at 11:15:37 AM. Contact: ###-####.
FIRE-Conference1/17/20071/18/20071/18/2007ADONE
DetailsTroy Cobbley
I spoke to troy about the fire hydrant located in the southwest corner of the property. It can be located on the outside of the fence but there needs to be 3' of clearance around it. Also the gates must be able to swing into the property so that the hydrant is not blocked.
BLD-Framing/Rough-in1/15/20071/16/20071/16/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/15/2007 at 9:48:07 AM. Contact: ###-####. Ceiling grid at commercial laundry room and conferance room, 1st. floor.
BLD-Conference1/2/20071/3/20071/3/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/2/2007 at 12:38:26 PM. Contact: ###-####. Ceiling grid insp in office at kitchen and went over cicsca 3 to 4 specs and what would be required.
BLD-Conference12/19/200612/19/200612/19/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/19/2006 at 7:32:06 AM. Contact: ###-####. Inspected firecaulking at lids abovegrids on all floors. Need ceiling plan from architect for grid system. Elec. room penetrations not yet done on all floors.
BLD-Conference12/18/200612/18/200612/19/2006PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/18/2006 at 8:24:44 AM. Contact: ###-####.
FIRE-Conference11/8/200611/9/200611/9/2006ANH
DetailsForrest France
Scheduled by a contractor via Hello! on 11/8/2006 at 11:35:12 AM. Contact: ###-####. Contractor not available.
BLD-Framing/Rough-in9/20/20069/20/20069/20/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/20/2006 at 10:29:50 AM. Contact: ###-####. Grid for hardlid in lobby area ok to rock.
BLD-Framing/Rough-in9/18/20069/18/20069/18/2006PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/18/2006 at 7:41:50 AM. Contact: ###-####.
BLD-Framing/Rough-in9/12/20069/12/20069/12/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/12/2006 at 10:48:33 AM. Contact: ###-####. Fire control panel has been boxed out in one hour wall at kitchen area.
BLD-Framing/Rough-in9/8/20069/8/20069/8/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/8/2006 at 10:03:54 AM. Contact: ###-####. 1st floor corridor lid, north and south wings. Majority of firecaulking complete. Areas left will be accessible thru hatches or soft grid.
BLD-Framing/Rough-in9/6/20069/7/20069/7/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/6/2006 at 7:03:24 PM. Contact: ###-####. 1st floor corridor lid, ok to start rock, will leave areas open were fire caulk not complete. ok to rock kitchen area and back offices. Still needs to box around fire panel at 1 hr. wall.
BLD-Framing/Rough-in9/5/20069/6/20069/6/2006PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/5/2006 at 10:52:27 AM. Contact: ###-####. Needs to complete the fire caulking at the 1st floor corridor lids. not ok to cover.
BLD-Framing/Rough-in9/4/20069/5/20069/5/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/4/2006 at 9:20:51 AM. Contact: ###-####. ok to insul. kitchen and back office areas. Needs to rock around fire control panel at 1 hr. wall.
BLD-Framing/Rough-in9/1/20069/1/20069/1/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/1/2006 at 11:02:03 AM. Contact: ###-####. 1st floor lids ok to rock, rooms only. Ceiling grid in pool room ok, ok to cover corridor betwwen pool room and excercise room.
BLD-Framing/Rough-in9/1/20069/1/20069/1/2006ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/1/2006 at 7:06:31 AM. Contact: ###-####. canc by contractor.
BLD-Framing/Rough-in8/30/20068/31/20068/31/2006PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/30/2006 at 3:57:17 PM. Contact: ###-####. 1st floor lids, south wing, rooms only. Needs to complete fire caulking of penetrations at ceiling assembly.
BLD-Framing/Rough-in8/29/20068/29/20068/29/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/29/2006 at 7:06:52 AM. Contact: ###-####. ok to insul. corridor between pool room and excercise room.
BLD-Framing/Rough-in8/25/20068/25/20068/25/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/25/2006 at 9:23:32 AM. Contact: ###-####. insul. at mech room, 1st floor.
BLD-Framing/Rough-in8/22/20068/22/20068/22/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/22/2006 at 7:37:56 AM. Contact: ###-####. ok to rock 2hr wall at mech. room and reinstall furr out wall.
BLD-Framing/Rough-in8/18/20068/21/20068/21/2006APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/18/2006 at 2:49:55 PM. Contact: ###-####. 2nd floor drops ok
BLD-Other8/16/20068/17/20068/17/2006APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/16/2006 at 11:25:26 AM. Contact: ###-####. insulation ok at conf room to bath room
BLD-Framing/Rough-in8/11/20068/11/20068/11/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/11/2006 at 7:15:22 AM. Contact: ###-####. ok to rock 3rd floor corridor lid, north and south wings. ok to cover pool room, excersizeroom. ok to oneside womens restroom and business center and insul. Need to verify putty pads at business center. ok to insul. mech room on first floor, but needs to remove furr out wall tro install insul. and 2 layers of 5/8 type x for 2 hour seperation wall.
BLD-Framing/Rough-in8/10/20068/10/20068/10/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/10/2006 at 7:10:44 AM. Contact: ###-####. 3rd floor corridor ceilings, north and south wings. needs to patch holesand fire caulk conduits. Condiuts at grid areas and not hardlid.
BLD-Framing/Rough-in8/8/20068/8/20068/8/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/8/2006 at 9:03:53 AM. Contact: ###-####. 4th floor corridor, north and south wings, ok to rock lid. soth wing elev. shaft insul. ok.
BLD-Framing/Rough-in8/7/20068/7/20068/7/2006PPASS
DetailsMike Jordan
1st floor, south wing, insulation at rooms. ok to cover rooms.
BLD-Framing/Rough-in8/7/20068/7/20068/7/2006ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/7/2006 at 7:20:21 AM. Contact: ###-####.
BLD-Framing/Rough-in8/4/20068/4/20068/4/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/4/2006 at 7:55:19 AM. Contact: ###-####. ok to rock lids at 3rd floor rooms. ok to insulate stairtowers and elevator shafts. still needs to complete work at 4thfloor corridor lid prior to rocking. ok to rock lid and walls at pool room.
BLD-Framing/Rough-in8/3/20068/3/20068/3/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/3/2006 at 6:50:21 AM. Contact: ###-####. ok to rock lids at guest laundry and corridor between lobby and north wing. Missing hardware at pool and excersise room at roof framing.
BLD-Framing/Rough-in8/1/20068/2/20068/2/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/1/2006 at 4:33:43 PM. Contact: ###-####. Intereior side of north wing ele. shaft. ok to insul.
BLD-Framing/Rough-in7/31/20068/1/20068/1/2006AFAIL
DetailsMike Jordan
3rd floor rooms, north wing, hard lid frame. Frame ok, needs to complete all firecaulking at envelope penetrations. do not cover.
BLD-Framing/Rough-in7/28/20067/31/20067/31/2006PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/28/2006 at 2:03:04 PM. Contact: ###-####.
BLD-Framing/Rough-in7/27/20067/27/20067/27/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/27/2006 at 10:45:20 AM. Contact: ###-####. ok to insulate 1st floor, south wing.
BLD-Framing/Rough-in7/26/20067/26/20067/26/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/26/2006 at 7:02:42 AM. Contact: ###-####. 1st floor norh wing insul ok. ok to cover. framing insp on 1st floor south wing, needs to add solid blocking behind floor to floor straps.
BLD-Framing/Rough-in7/20/20067/20/20067/20/2006PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/20/2006 at 8:56:23 AM. Contact: ###-####. contractor called and cancelled insp.
BLD-Framing/Rough-in7/18/20067/18/20067/18/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/18/2006 at 8:02:01 AM. Contact: ###-####. 1st floor framing, north wing.
BLD-Framing/Rough-in7/14/20067/14/20067/14/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/14/2006 at 7:10:44 AM. Contact: ###-####. 2nd floor south wing insul ok to cover. 1st floor framing, solid blocking needed behind straps, repair 4x6 post, cout floor joist, strap bottom plates. missing putty pads on elec. boxes.
BLD-Framing/Rough-in7/10/20067/11/20067/11/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/10/2006 at 4:16:04 PM. Contact: ###-####. insul. 2nd floor rooms, north wings.
BLD-Framing/Rough-in7/10/20067/10/20067/10/2006PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/10/2006 at 7:10:24 AM. Contact: ###-####. straps for dragtrusses not installed, roof framing for poolroom.
BLD-Framing/Rough-in7/5/20067/5/20067/5/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/5/2006 at 7:49:12 AM. Contact: ###-####. roof framing at lobby area. ok to rock ceiling.
BLD-Framing/Rough-in6/29/20066/29/20066/29/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/29/2006 at 10:39:36 AM. Contact: ###-####. 2nd floor, north and south wings, allframing issues have been repaired. Putty pads installed. ok to insulate rooms.
BLD-Framing/Rough-in6/28/20066/28/20066/28/2006PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/28/2006 at 7:35:10 AM. Contact: ###-####. 2nd floor, north and south wings. work not completed.
FIRE-Conference6/27/20066/27/20066/27/2006PDONE
DetailsTroy Cobbley
I notified the contractor the the cut-ins for the fire extinguisher cabinets in the corridor walls appear to be too low.
BLD-Framing/Rough-in6/27/20066/27/20066/27/2006PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/27/2006 at 7:31:59 AM. Contact: ###-####. 2nd floor, southwing. Needs to repair cut trusses shafts, installl straps on top plates and is missing puttypads on elec. boxes. Gave ok to oneside framing at concealed locations in lobby area so that insul can be installed.
BLD-Framing/Rough-in6/26/20066/26/20066/26/2006PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/26/2006 at 7:52:30 AM. Contact: ###-####. 2nd floor,north wing. Needs to supply an approved fix and fix all fllor joist that have been cut or notched. Needs to install straps on top plates and repair studs that have been cut. Also needs to repair shaft at northend rooms. ok to insul. walls.
BLD-Framing/Rough-in6/21/20066/21/20066/21/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/21/2006 at 8:02:57 AM. Contact: ###-####. Insul. in 3rd floor rooms south wing. ok to rock walls
BLD-Framing/Rough-in6/20/20066/20/20066/20/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/20/2006 at 6:40:21 AM. Contact: ###-####. Reinspected 4th floor rooms, north and south wings. All penetrations were firecaulked, radiation dampers installed at one hour ceiling wall assembly. Fatggrid ok. ok to hang rock.
BLD-Framing/Rough-in6/16/20066/16/20066/16/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/16/2006 at 8:08:47 AM. Contact: ###-####.4th floor north and south wing rooms, inspected fat grid for shhet rock lid and firecaulking of penetrations above lid. Noted that not all penetrations are completed and that 4 vent fans are required to have radiation dampers at 1 hour ceiling assembly. ok to start sheet rocking in areas that are completed.
BLD-Framing/Rough-in6/15/20066/15/20066/15/2006PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/15/2006 at 7:57:53 AM. Contact: ###-####. Needs to complete firecaulking of penetrations prior to inspecting ceiling grid.
BLD-Framing/Rough-in6/12/20066/13/20066/13/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/12/2006 at 7:24:33 AM. Contact: ###-####.ok to hang rock at rooms 3rd floor northwing. firecaulking and puttypads installed. ok to insulate rooms at 3rdfloor south wing.
BLD-Framing/Rough-in6/12/20066/12/20066/12/2006PDEFR
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/12/2006 at 7:24:33 AM. Contact: ###-####.tue 6/13/06 450
BLD-Framing/Rough-in6/7/20066/7/20066/7/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/7/2006 at 6:48:30 AM. Contact: ###-####. 3rd floor, south wing rooms. ok to insulate ceilings only. Needs to complete install of putty pads.
BLD-Framing/Rough-in6/1/20066/2/20066/2/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/1/2006 at 2:43:58 PM. Contact: ###-####. 3rd floor, north wing, ok to insulate ceilings in rooms.
BLD-Framing/Rough-in5/24/20065/24/20065/24/2006PPASS
DetailsMike Jordan
All items on 3rd floor north wing have been resolved. ok to insulate walls.
BLD-Framing/Rough-in5/23/20065/24/20065/24/2006ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/23/2006 at 4:38:41 PM. Contact: ###-####.
BLD-Framing/Rough-in5/22/20065/23/20065/23/2006AFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/22/2006 at 4:55:30 PM. Contact: ###-####.Needs to complete all fire caulking of penetrations at wall and floor ceiling assemblies 3rd floor North wing. Strap top plate 3rd floor north wing. Repair shaft at 3rd floor north wing.
BLD-Framing/Rough-in5/18/20065/19/20065/19/2006ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/18/2006 at 3:49:20 PM. Contact: ###-####.
BLD-Framing/Rough-in5/18/20065/18/20065/18/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/18/2006 at 7:39:38 AM. Contact: ###-####. roof framing south wing.
BLD-Framing/Rough-in5/15/20065/15/20065/15/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/15/2006 at 7:02:59 AM. Contact: ###-####. 4th floor, north and south wings, ok to insul. rooms in south wings, north wing almost complete.
BLD-Framing/Rough-in5/10/20065/10/20065/10/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/10/2006 at 7:54:55 AM. Contact: ###-####. Room 420 ok.
BLD-Framing/Rough-in5/8/20065/9/20065/9/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/8/2006 at 2:47:22 PM. Contact: ###-####. 4th floor, north wing corridor and rooms. ok to rock corridor lid, insulate rooms, except for room #420 and elevator and stairway lobby.
BLD-Framing/Rough-in5/4/20065/4/20065/4/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/4/2006 at 8:45:31 AM. Contact: ###-####. ok to rock lids of elec room on 1st 2nd and 3rd fllors. All roof framing issues have been resolkved. ok to insulate corridor lid at 4th floor and corridor walls.
BLD-Framing/Rough-in5/2/20065/3/20065/3/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/2/2006 at 4:34:35 PM. Contact: ###-####. Roof framing north wing, Needs to add hangers to girder trusses to support joists Needs to complete fire caulking at penetrations below walkway, and puuty pad elec. boxes. also needs to complete fire caulking as per listing on floor ceiling penetrations at elec. rooms on floors 1 to 3 prior to rocking the lids.
BLD-Framing/Rough-in5/1/20065/2/20065/2/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/1/2006 at 4:05:46 PM. Contact: ###-####. 2nd floor shafts, north wing.
FIRE-Conference5/1/20065/1/20065/1/2006PDONE
DetailsTroy Cobbley
I spoke to the general contractor about getting the damaged fire hydrant that is located in the southeast corner of the project repaired as soon as possible. He stated that he had already started the process.
BLD-Framing/Rough-in4/24/20064/25/20064/25/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/24/2006 at 4:06:40 PM. Contact: ###-####. Shear nailing on corridors at 1st 2nd 3rd and fourth floors.
BLD-Framing/Rough-in4/17/20064/17/20064/17/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/17/2006 at 7:14:28 AM. Contact: ###-####. 2nd floor, south wing vent shaft walls
BLD-Conference4/13/20064/13/20064/13/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/13/2006 at 10:02:32 AM. Contact: ###-####. Discussed enclosure for fire dampers from floor to floor.
BLD-Other4/10/20064/10/20064/10/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/10/2006 at 9:54:36 AM. Contact: ###-####. insulation behind shaft walls.
BLD-Conference4/4/20064/4/20064/4/2006PDONE
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/4/2006 at 8:22:19 AM. Contact: ###-####. Received and reviewed UL listings for rated penetrations with plumber. Also noted to contractor that elec. and mech. contractors need to supply UL listings. Also discussed other rated issues with contactor.
BLD-Framing/Rough-in3/30/20063/30/20063/30/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/30/2006 at 7:46:52 AM. Contact: ###-####. Roof nailing and mansard.
FIRE-Conference3/16/20063/16/20063/16/2006PDONE
DetailsTroy Cobbley
The wet stand pipes have been installed as dry temporarily with dave hannimans approval. Signage with gpm and psi requirements have been placed at the fdc. The standpipes are to be converted to wet when the building is enclosed and heated. Work can now continue on the fourth floor and above.
FIRE-Conference3/15/20063/15/20063/15/2006PDONE
DetailsTroy Cobbley
I left a stop work notice for all work on the 4th floor and above until standpipes have been installed per the fire dept. review comment #49.
BLD-Framing/Rough-in2/21/20062/21/20062/21/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/21/2006 at 9:32:45 AM. Contact: ###-####.
BLD-Framing/Rough-in1/20/20061/20/20061/20/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/20/2006 at 7:41:54 AM. Contact: ###-####. Shear nailing on exterior west wall of north wing, 2nd to 4th floors.
BLD-Framing/Rough-in12/30/200512/30/200512/30/2005PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/30/2005 at 11:13:44 AM. Contact: ###-####. 1st to 2nd floor shear nailing and floor to floor straps at exterior walls north and south wings. Also shear nailing on exterior walls at pavillion.
BLD-Concrete11/21/200511/22/200511/22/2005APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/21/2005 at 3:02:54 PM. Contact: ###-####. 3rd floor decking at corridors. Also inspected reinforcement for pool, which is under a different permit.
BLD-Framing/Rough-in11/14/200511/15/200511/15/2005PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/14/2005 at 8:34:16 AM. Contact: ###-####. Interior shear at north wing first floor.
BLD-Other10/26/200510/27/200510/27/2005AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/26/2005 at 3:49:38 PM. Contact: ###-####. need engineer to resolve steel cross beam bolt conections/ arch to address ledger angle and flutes to maintain fire rating.
BLD-Aging Inspection10/11/200510/11/200510/11/2005 PASS
DetailsJim Storey
wip
BLD-Other8/9/20058/11/20058/11/2005APASS
DetailsJim Storey
job conf. 900 am on site.
BLD-Other8/9/20058/11/20058/11/2005ADONE
DetailsMike Jordan
900 am on site job meeting
BLD-Concrete8/9/20058/10/20058/10/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/9/2005 at 4:36:03 AM. Contact: ###-####. placed w/si
BLD-Concrete8/9/20058/9/20058/9/2005AFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/9/2005 at 4:35:22 AM. Contact: ###-####.Welded wire mesh not being adequtley lifted during concrete placement, on ground in some cases. concrete dobees should be used to gain proper clearance. reinforcement not properly tied into place at grade beams, reinforcement is being "wet stabbed" Concrete being placed is to "wet" 10 and 11 inch slumps as per special inspector.
BLD-Concrete8/5/20058/8/20058/8/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/5/2005 at 2:44:37 PM. Contact: ###-####. slab on grade ok per plan.
BLD-Foundation7/19/20057/20/20057/20/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/19/2005 at 3:18:33 PM. Contact: ###-####.placed w si
BLD-Footing7/13/20057/14/20057/14/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/13/2005 at 11:52:20 AM. Contact: ###-####.si
BLD-Foundation7/12/20057/12/20057/12/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/12/2005 at 7:09:25 AM. Contact: ###-####.
BLD-Foundation7/6/20057/7/20057/7/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/6/2005 at 3:17:42 PM. Contact: ###-####.pwsi
BLD-Footing7/6/20057/7/20057/7/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/6/2005 at 3:17:05 PM. Contact: ###-####.pwsi
BLD-Foundation7/1/20057/5/20057/5/2005APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/1/2005 at 2:28:46 PM. Contact: ###-####.
BLD-Footing7/1/20057/5/20057/5/2005APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/1/2005 at 2:29:24 PM. Contact: ###-####.
BLD-Foundation6/29/20056/30/20056/30/2005APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/29/2005 at 12:07:51 PM. Contact: ###-####. Stemwall on east end
BLD-Footing6/28/20056/28/20056/28/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/28/2005 at 7:03:12 AM. Contact: ###-####.pwsi
BLD-Footing6/27/20056/27/20056/27/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/27/2005 at 7:14:29 AM. Contact: ###-####.placed w/si
BLD-Footing6/22/20056/23/20056/23/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/22/2005 at 4:28:42 PM. Contact: ###-####.wip/pwsi
BLD-Foundation6/21/20056/22/20056/22/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/21/2005 at 3:58:15 PM. Contact: ###-####.pwsi
BLD-Foundation6/20/20056/21/20056/21/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/20/2005 at 4:55:35 PM. Contact: ###-####.placed/w/si
BLD-Footing6/20/20056/21/20056/21/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/20/2005 at 4:54:57 PM. Contact: ###-####. placed w/si
BLD-Foundation6/17/20056/20/20056/20/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/17/2005 at 1:40:14 PM. Contact: ###-####.pending si
BLD-Footing6/17/20056/20/20056/20/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/17/2005 at 1:38:27 PM. Contact: ###-####.si pending.
BLD-Footing6/15/20056/16/20056/16/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/15/2005 at 3:28:09 PM. Contact: ###-####.placed w/si
BLD-Footing6/14/20056/15/20056/15/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/14/2005 at 10:49:56 AM. Contact: ###-####. grid lines 1-11 to a-f rebar ok pending special insp.
BLD-Conference6/9/20056/9/20056/9/2005PPASS
DetailsJim Storey
josh; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need scope letter from mti