BLD-Aging Inspection | 12/9/2008 | 12/9/2008 | 12/9/2008 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 12/9/2008 | 12/9/2008 | 12/9/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/7/2008 | 10/7/2008 | 10/13/2008 | | PART |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/25/2008 | 2/26/2008 | 2/26/2008 | A | PASS |
Forrest France
|
|
|
Corrections are complete, life safety inspection passed. Noted the elevator fire door needs adjusted for complete closure-to be repaired prior to structural final as discussed.
|
BLD-Aging Inspection | 2/22/2008 | 2/22/2008 | 2/22/2008 | | PASS |
Dave Hannah
|
|
|
called ekc the contractor they will check into c/n items and schedule finals
|
BLD-Final | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/19/2005 at 8:11:33 AM. Contact: ###-####.
|
FIRE-Final Inspection | 7/18/2005 | 7/19/2005 | 7/19/2005 | A | FAIL |
Forrest France
|
|
|
Repair non-functioning exit sign in corridor, install escutcheon on fire sprinkler head in custodial room.
|
BLD-Other | 6/15/2005 | 6/15/2005 | 6/15/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 7:26:49 AM. Contact: ###-####. ceiling grid ok to cover
|
BLD-Framing/Rough-in | 5/19/2005 | 5/19/2005 | 5/19/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 7:06:09 AM. Contact: ###-####.ok to cover
|
BLD-Framing/Rough-in | 5/12/2005 | 5/12/2005 | 5/12/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/12/2005 at 8:22:53 AM. Contact: ###-####. Dan stwert has a hold on this project no inspections a to be done untill new plans are resubmitted
|