BLD-Final | 2/24/2005 | 2/25/2005 | 2/25/2005 | A | PASS |
Lane Manuel
|
|
|
marty; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
perm c of o ok 2/25/2005 11:39:43 AM
|
Permanent Occupancy | | 2/25/2005 | 2/25/2005 | | DONE |
|
|
|
|
BLD-Final | 2/17/2005 | 2/18/2005 | 2/18/2005 | P | PART |
Dave Hannah
|
|
|
marty; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp occ needs todrop sink in break room to 34 inchs and finsh installing glassing ii entry way 2/18/2005 4:06:52 PM
|
FIRE-Final Inspection | 2/17/2005 | 2/18/2005 | 2/18/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled. Structural please verify that the exit sign at front of north side is repaired and correct sticker at main exit 2/18/2005 12:32:24 PM
|
FIRE-Final Inspection | 2/16/2005 | 2/17/2005 | 2/17/2005 | A | FAIL |
Troy Cobbley
|
|
|
Door hardware not done, exit sign doesn't work. Asked contractor to check everything before reinspection 2/17/2005 9:31:09 AM
|
BLD-Framing/Rough-in | 2/2/2005 | 2/2/2005 | 2/2/2005 | P | PART |
Lane Manuel
|
|
|
marty; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok to cover walls pending plumbing insp. approval 2/2/2005 4:06:39 PM
|