BLD-Final | 6/11/2007 | 6/12/2007 | 6/12/2007 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 6/12/2007 | 6/12/2007 | 6/12/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 6/12/2007 | 6/12/2007 | 6/12/2007 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Other | 3/20/2007 | 3/22/2007 | 3/22/2007 | A | PASS |
Dave Hannah
|
|
|
Rob Swimming Pool Rebar; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok to pour
|
BLD-Final | 11/28/2006 | 11/28/2006 | 11/29/2006 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/28/2006 at 7:30:32 AM. Contact: ###-####.everything in the house is ok but still needs to finish driveway and pool ok to move in
|
BLD-Conference | 5/16/2006 | 5/16/2006 | 5/16/2006 | P | PASS |
Dave Hannah
|
|
|
conference on framing///rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Wall cover | 3/28/2006 | 3/28/2006 | 3/28/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/28/2006 at 7:18:37 AM. Contact: ###-####.
|
BLD-Energy code compliance | 3/28/2006 | 3/28/2006 | 3/28/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/28/2006 at 7:17:13 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/16/2006 | 3/17/2006 | 3/17/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/16/2006 at 7:35:34 AM. Contact: ###-####.ok to insulate
|
BLD-Framing/Rough-in | 3/6/2006 | 3/7/2006 | 3/7/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/6/2006 at 9:01:21 PM. Contact: ###-####.roof framing
|
BLD-Framing/Rough-in | 1/25/2006 | 1/25/2006 | 1/25/2006 | P | PART |
Tony Young
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to insulate w/ foam and blow in on roof in master and one lower bath area where there is to be dropped ceilings,, all trades will be below this area.
|
BLD-Framing/Rough-in | 8/9/2005 | 8/9/2005 | 8/9/2005 | P | PART |
Dave Hannah
|
|
|
###-#### - rob Note: shear std 14s and phd6s at garage installed and ok to cover with sheeting
|
BLD-Foundation | 4/26/2005 | 4/26/2005 | 4/27/2005 | P | PASS |
Dave Hannah
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 4/6/2005 | 4/7/2005 | 4/7/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/6/2005 at 12:07:34 PM. Contact: ###-####.
|
BLD-Foundation | 4/6/2005 | 4/7/2005 | 4/7/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/6/2005 at 12:08:10 PM. Contact: ###-####. the last of full height walls in front 4/7/2005 10:44:11 AM
|
BLD-Grading Inspection | 3/4/2005 | 3/4/2005 | 3/4/2005 | | DONE |
|
|
|
Footing subgrade for lower level approvd by the geotechnical engineer
|
BLD-Foundation | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | PART |
Troy James
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore mostly high walls at this time 2/22/2005 3:41:21 PM
|
BLD-Footing | 2/4/2005 | 2/7/2005 | 2/7/2005 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 2/4/2005 | 2/4/2005 | 2/4/2005 | P | PART |
Dave Hannah
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Grading Inspection | 2/3/2005 | 2/3/2005 | 2/3/2005 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|