BLD-Conference | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | PASS |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore conf on prior c/n,, will schedule final soon
|
BLD-Final | 6/28/2005 | 6/29/2005 | 6/29/2005 | A | FAIL |
Tony Young
|
|
|
kitty Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles c/n posted
|
BLD-Conference | 2/28/2005 | 3/4/2005 | 3/4/2005 | P | CANC |
Tony Young
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 2/28/2005 | 2/28/2005 | 2/28/2005 | P | PART |
Tony Young
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
ok to continue,,, 1 hr has been met w/ brick on exterior at 2nd story area,,, stairs to meet code by final 2/28/2005 2:32:43 PM
|
BLD-Wall cover | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | FAIL |
Troy James
|
|
|
stairs are still not in compliance, need 11" tread with no nosing, 1 hr wall seperation not installed per plans, double layer of 1/2 rock to one side does not meet 1 hr seperation and was not approved by Perry as said per contractor, 2/22/2005 3:09:39 PM 2/22/2005 3:11:09 PM
|
BLD-Framing/Rough-in | 2/2/2005 | 2/3/2005 | 2/3/2005 | P | FAIL |
Tony Young
|
|
|
Bill; Phone #: ###-#### Internet Inspection Request from: Jan Rice
c/n posted,,, need stairs per code,, fans hooked up,, trades,, 1 hr seperation 2/3/2005 4:11:16 PM
|
BLD-Conference | 1/21/2005 | 1/24/2005 | 1/24/2005 | A | PART |
Tony Young
|
|
|
bill - ###-####
part of wall cant be insulated as reqd,,, do blow in or hard insulation,,, about 20 feet,,, also hanger bath ceiling,,, support under floor,,, stairs to meet code,, 1/24/2005 12:00:26 PM
|
BLD-Final | 7/1/2005 | 7/1/2005 | | P | |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|