BLD-Final | 6/2/2005 | 6/6/2005 | 12/8/2009 | A | CANC |
Jim Sly
|
|
|
kari; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Aging Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 | P | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 5/19/2009 | 5/19/2009 | 5/19/2009 | P | PASS |
Mike Jordan
|
|
|
Permit has expired. No further response from builder to try and resolve issue.
|
BLD-Conference | 10/10/2008 | 10/10/2008 | 10/10/2008 | A | DONE |
Mike Jordan
|
|
|
Contacted Status Homes in the AM. I recieved a call back from Status homes at approx. 2:47pm from one of thier superintendants. Noted to super that this home did not have a final insp. or cert. of occ. Home is occupied. All other trades have been finaled. Super with Staus homes noted that he would contact hom eowners and inform them of the situation and try to cordinate with home owner to when a final insp. could be scheduled.
|
BLD-Conference | 10/10/2008 | 10/10/2008 | 10/10/2008 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 4/14/2008 | 4/14/2008 | 4/14/2008 | P | PEND |
Mike Jordan
|
|
|
Spoke with Kerrie wit Status Homes. He noted that he would do some researsh to find out if he ever got a final on this house and would call me back.
|
BLD-Energy code compliance | 4/25/2005 | 4/26/2005 | 4/26/2005 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/25/2005 at 4:11:38 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/25/2005 | 4/26/2005 | 4/26/2005 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/25/2005 at 4:11:03 PM. Contact: ###-####.
|
BLD-Wall cover | 4/7/2005 | 4/8/2005 | 4/8/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 7:24:28 PM. Contact: ###-####.
|
BLD-Energy code compliance | 4/6/2005 | 4/7/2005 | 4/7/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/6/2005 at 5:06:40 PM. Contact: ###-####.sealpackage ok 4/7/2005 10:51:36 AM
|
BLD-Framing/Rough-in | 4/6/2005 | 4/7/2005 | 4/7/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/6/2005 at 5:07:21 PM. Contact: ###-####.
|
BLD-Foundation | 2/24/2005 | 2/25/2005 | 2/25/2005 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/24/2005 at 10:44:25 AM. Contact: ###-####.
stemwalls ok 2/25/2005 10:02:40 AM
|
BLD-Footing | 2/24/2005 | 2/24/2005 | 2/24/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/24/2005 at 10:44:00 AM. Contact: ###-####.
2/24/2005 3:06:28 PM
footings ok 2/24/2005 4:01:40 PM
|