BLD-Final | 7/13/2005 | 7/14/2005 | 7/14/2005 | A | PASS |
Jim Sly
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/C issued
|
BLD-Final | 7/12/2005 | 7/13/2005 | 7/13/2005 | A | FAIL |
Jim Sly
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Called Contractor......Need Plumbing final. He did not return my call.
|
BLD-Energy code compliance | 4/20/2005 | 4/21/2005 | 4/21/2005 | A | PASS |
Jim Sly
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 4/20/2005 | 4/21/2005 | 4/21/2005 | A | PASS |
Jim Sly
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 4/18/2005 | 4/19/2005 | 4/19/2005 | A | FAIL |
Tony Young
|
|
|
VAL; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
c/n posted,, ok to insulate 4/19/2005 10:36:57 AM
|
BLD-Framing/Rough-in | 4/14/2005 | 4/15/2005 | 4/15/2005 | P | FAIL |
Jim Sly
|
|
|
val; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Steve Munroe called and said that Marlene wanted a stop work on this house because of promblem with subdivision req. (not disclosed) 4/15/2005 2:25:57 PM
|
BLD-Framing/Rough-in | 4/4/2005 | 4/5/2005 | 4/5/2005 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/4/2005 at 4:17:30 PM. Contact: ###-####. C/N..... N. on M. G. L Edna.... R Dalton... R D. PL. 4/5/2005 10:12:57 AM
|
BLD-Foundation | 2/16/2005 | 2/17/2005 | 2/17/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/16/2005 at 7:08:34 AM. Contact: ###-####.
|
BLD-Footing | 2/16/2005 | 2/16/2005 | 2/16/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/16/2005 at 7:08:13 AM. Contact: ###-####. Off Dalton..... Between Ustick and Mc millan. 2/16/2005 10:05:09 AM
|