BLD-Final | 12/22/2005 | 12/22/2005 | 12/22/2005 | P | PASS |
Jim Storey
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Permanent Occupancy | | 12/22/2005 | 12/22/2005 | | DONE |
|
|
|
|
BLD-Final | 11/30/2005 | 12/1/2005 | 12/1/2005 | A | FAIL |
Jim Storey
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Aging Inspection | 11/15/2005 | 11/15/2005 | 11/15/2005 | | NR |
Jim Storey
|
|
|
|
Code Occupancy Approval | 9/15/2005 | 9/15/2005 | 9/19/2005 | P | CANC |
Wm. Michael Meloy
|
|
|
|
BLD-Final | 8/29/2005 | 8/30/2005 | 8/30/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/29/2005 at 3:36:20 PM. Contact: ###-####.temp pending shell.
|
FIRE-Final Inspection | 8/29/2005 | 8/30/2005 | 8/30/2005 | A | PASS |
Forrest France
|
|
|
Life safety passed inspection.
|
FIRE-Final Inspection | 8/26/2005 | 8/29/2005 | 8/29/2005 | P | FAIL |
Forrest France
|
|
|
Locate building address to face Bown Way, provide fire extinguisher on the upstairs level, verify door hardware after installation.
|
FIRE-Final Inspection | 8/25/2005 | 8/26/2005 | 8/26/2005 | P | NR |
Forrest France
|
|
|
Canceled inspection per contractor, project is not complete.
|
BLD-Aging Inspection | 8/24/2005 | 8/24/2005 | 8/24/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Energy code compliance | 6/23/2005 | 6/24/2005 | 6/24/2005 | A | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 6/23/2005 | 6/23/2005 | 6/23/2005 | P | NR |
Jim Storey
|
|
|
glen ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 6/22/2005 | 6/23/2005 | 6/23/2005 | P | PASS |
Jim Storey
|
|
|
glen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 6/21/2005 | 6/22/2005 | 6/22/2005 | A | NR |
Jim Storey
|
|
|
glen; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 6/7/2005 | 6/8/2005 | 6/8/2005 | A | PART |
Jim Storey
|
|
|
glen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles sheer nailling and roof nailling ok for cover.
|
BLD-Framing/Rough-in | 6/1/2005 | 6/2/2005 | 6/2/2005 | A | FAIL |
Jim Storey
|
|
|
glen Note: shear wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles nail tpo plates thur out all pannels/block and nail butt joints/nail king studs at holddowns.
|