Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-00366
StatusFinaled
Name RYAN SUMMERS
Site Address 3437 E BOISE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
"THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a four bedroom, four and quarter bathroom 3415 sq. ft. two story single family dwelling (2815 sq. ft. first floor/600 sq. ft. second floor) with a attached 895 sq. ft. three car garage and a 418 sq. ft. covered back porch. Existing structure to demolished under BLD04-02842. Per approved plans and requirement list. CZC05-00003 per Carl Miller with Planning and Zoning. (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/24/20058/24/20058/24/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/24/2005 at 9:51:09 AM. Contact: ###-####.
DOC - Permit Finaled8/24/20058/24/20058/24/2005PPASS
DetailsJim Storey
BLD-Other7/28/20057/28/20057/28/2005APART
DetailsBob Archibald
Permit applicant must post $2000.00 bond for driveway and complete work within 90 days or forfit bond. Once bond is posted COC can be issued. Brandon ###-####.
BLD-Final7/13/20057/14/20057/14/2005PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/13/2005 at 2:21:42 PM. need address and drivway blk top.
BLD-Framing/Rough-in4/25/20054/26/20054/26/2005APASS
DetailsJim Storey
ryan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance4/25/20054/26/20054/26/2005APASS
DetailsJim Storey
ryan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Wall cover4/15/20054/18/20054/18/2005ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/15/2005 at 7:46:29 AM.
BLD-Energy code compliance4/15/20054/18/20054/18/2005ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/15/2005 at 7:45:51 AM.
BLD-Framing/Rough-in4/15/20054/15/20054/15/2005PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/15/2005 at 7:44:12 AM. mech c/n pending
BLD-Energy code compliance4/11/20054/12/20054/12/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/11/2005 at 6:20:20 PM. Contact: ###-####.c/n posted
BLD-Framing/Rough-in4/4/20054/5/20054/5/2005PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/4/2005 at 3:54:47 PM. Contact: ###-####.
BLD-Framing/Rough-in3/31/20054/1/20054/1/2005AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/31/2005 at 12:09:00 PM. Contact: ###-####. no inspection done needs mec and elec permits pulled and roughins done 4/1/2005 9:38:29 AM
BLD-Foundation2/25/20052/25/20052/25/2005PPASS
DetailsLane Manuel
james; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing2/24/20052/24/20052/24/2005PPASS
DetailsJim Storey
ryan summers-- ###-#### wip