FIRE-Final Inspection | 8/9/2005 | 8/10/2005 | 8/9/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Final | 8/9/2005 | 8/9/2005 | 8/9/2005 | | DONE |
|
|
|
Final ok/Tony Young
|
FIRE-Final Inspection | 8/4/2005 | 8/5/2005 | 8/4/2005 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Bills permission until the fire sprinkler plans are resubmitted and approved showing the correct pendant heads used. Life safety ok to final when sprinkler permit is finaled
|
FIRE-Final Inspection | 5/4/2005 | 5/5/2005 | 5/5/2005 | P | CANC |
Troy Cobbley
|
|
|
###-#### shane Per Bill Alexander, this permit can be finaled when construction under the other building permit has started.
|
BLD-Final | 5/4/2005 | 5/5/2005 | 5/5/2005 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/4/2005 at 4:21:35 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/25/2005 | 4/26/2005 | 4/26/2005 | A | PART |
Tony Young
|
|
|
ceiling grid shane; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok to cover ceiling after mech. and elec. 4/26/2005 9:58:48 AM
|
BLD-Framing/Rough-in | 4/14/2005 | 4/14/2005 | 4/14/2005 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/14/2005 at 7:53:14 AM. Contact: ###-####.
c/n posted 4/14/2005 4:09:16 PM
|