BLD-Final | 4/19/2005 | 4/20/2005 | 4/20/2005 | P | PASS |
Troy James
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/30/2005 at 9:14:40 AM. Contact: ###-####.
|
BLD-Foundation | 3/3/2005 | 3/4/2005 | 3/4/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/3/2005 at 12:08:10 PM. Contact: ###-####. Verified Ufer ground......(1) 25' copper wire (footing) and (1) 20 ' rebar in wall. OK. 3/4/2005 10:07:27 AM
|
BLD-Foundation | 3/2/2005 | 3/3/2005 | 3/3/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 10:43:14 AM. Contact: ###-####.
|